Payette National Forest of Forest Service posted this Combined Synopsis/Solicitation on Oct 29, 2026. Responses are due Nov 29, 2026. NAICS 237110 (Water and Sewer Line and Related Structures Construction), product or service code Z2JZ (Repair or Alteration of Other Miscellaneous Buildings). Set-aside: Total Small Business Set-Aside (FAR 19.5). Place of performance: Idaho 83638. Solicitation number 1240LT27Q0027.
A. This project consists of modifying an existing waterline and replacing a water hydrant, removing an existing wood deck and constructing a new metal deck, replacing the existing roof, abatement of lead-based paint, removing lead-based paint siding, installing new siding, and preparing and painting exterior surfaces of the New Meadows Range Barn located at the New Meadows Barracks administrative site located at 100 S Norris Ave. New Meadows, ID 83654.
B. Base work includes the following described below:
1. Removal of existing roofing, installation of plywood sheathing over the existing skip sheathing, installation of ice/water shield over the entire roof, and installation of new corrugated metal roofing.
2. Abatement of lead-based paint of rafter tails, soffit, & fascia; and painting of aforementioned surfaces.
3. Removal of lead-based paint siding and felt paper, installation of plywood sheathing and building wrap, installation of new siding in-kind, installation of new trim in-kind around the windows, doors, and corners and painting of all aforementioned surfaces.
4. Replacement of approximately 10-feet of existing 1-inch SIDR 9 HDPE waterline including moving the existing hydrant location 2-feet to the east along the side of the building and replacement of the existing hydrant with a new hydrant and drainage basin. Additionally, replacement of an existing galvanized barb fitting with a brass barb fitting is required.
C. Optional work includes the following described below:
1. Removal of existing wood decking and foundation piers and fabrication and installation of new expanded metal decking with steps over a metal frame with new foundation piers.
D. Quantities associated with these options are identified in the Schedule of Items