FA8501 Opl Contracting Afsc/Pzio of Department of the Air Force posted this Special Notice on Nov 6, 2026. Responses are due Nov 20, 2026. NAICS 236220 (Commercial and Institutional Building Construction), product or service code Z2JZ (Repair or Alteration of Other Miscellaneous Buildings). Place of performance: Georgia 31098. Solicitation number FA8501-27-RAPID-CIRCUIT-F1-170129-OTA.
FA8501-27-RAPID-CIRCUIT F1-170129-OTA
Under the RAPID Umbrella Framework: RAPID Progressive Design-Build to Replace Circuit F-01 from Fowler Substation UHHZ170129
Description
The Department of the Air Force, 78th Civil Engineer Group, Robins Air Force Base, Georgia, is issuing this Special Notice under the Robins Agile Practices for Infrastructure Development (RAPID) umbrella framework and pursuant to 10 U.S.C. § 2808a.
The Government seeks industry Solution Briefs for an anticipated Other Transaction Agreement (OTA) to Replace Circuit F-01 from Fowler Substation at Robins AFB, GA. The requirement includes replacement of all 15kV, 500MCM cable throughout circuit F-01. This will include replacement and removal all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes.
This Special Notice is not an invitation for bids, a request for proposals under the Federal Acquisition Regulation, nor a commitment by the Government to make an award. Any resulting instrument will be an OTA for facility construction and repair under 10 U.S.C. § 2808a.
Purpose
The purpose of this Area of Interest is to obtain commercially viable, safe, and schedule-credible solutions to design plans for and to perform the replacement of expired high-risk Circuit F01 cabling in order to prevent operational risk, mission delays, and compounding economic costs due to infrastructure failure at Robins Air Force Base, Georgia.
The Government requires an integrated approach to address the design, removal of deteriorated cables and replacement with new cable in The Fowler Substation. The selected approach must provide a practical path to execute the work while minimizing disruption to aircraft operations and controlling construction, safety, environmental, and schedule risks.
Project Background and Existing Conditions
Circuit F-01 has surpassed its operational lifecycle, creating a high-probability risk for catastrophic failure. If the remaining aged portion is not replaced, the installation faces risk of emergency repair premiums and disruption to sustaining airfield infrastructure, supporting safe aircraft movement, installation readiness, and continued mission operations.
The work area is slightly congested and impacted by various airfield operations. The Fowler Substation Circuit F-01 will remain in full operation during the entire duration of the project by back feeding with circuit ties.
Project Areas
Completion of final design and full construction execution (exercised upon agreement). Safely construct the facility/project within the agreed GMP and schedule. Assume hazardous materials exist. Address requirements for worker notification, abatement, and disposal. Employ a safety and health professional to provide a HASP per DoDI 6055.01. Comply with Robins Environmental Requirements (Section 01560) submitting Waste Management Report/Landfill Waste Tickets, Solid Waste Disposal Plan, and Qualified Recycling Program (QRP). Appropriately coordinate Stormwater & Erosion Control. Structure execution to allow for payable milestones payments, as well as all other aspects outlined in the SOO.
Replace all 15kV, 500MCM cable throughout the distribution of circuit F-01 in its entirety of
multiple different installation facilities, while remaining in full operation besides outages and removing and replacing all broken breakers or bad cable racks, install new bell ends on conduits, and pump water/dirt from manholes. Address specific phasing to accommodate congested areas.
OTA & RAPID Framework Approach
This project is being executed as an Area of Interest (AOI) under the overarching RAPID (Robins Agile Practices for Infrastructure Development) Umbrella Program Notice. In accordance with the RAPID framework, this project utilizes a Progressive Design-Build approach under the standalone statutory authority of 10 U.S.C. § 2808a. The Government will be expecting a 100% completed design package and/or specific phasing and repair requirements followed by the completion of the construction or performance of the designed actions.
Competitive Selection Process
Phase 1 Solution Brief Requirements
The Government reserves the right, at its sole discretion, to determine that a response which does not conform to the requirements or instructions contained in this announcement is ineligible for further consideration.
Interested respondents shall submit a Phase 1 Solution Brief in a clear, concise, and organized manner in accordance with this announcement. To facilitate an efficient review, responses shall be prepared in accordance with the instructions and formatting requirements contained in this announcement.
Failure to comply with these requirements may increase the risk that the response will not be considered for further evaluation. The Government will evaluate them to identify the most highly qualified parties. Submission Requirement should be submitted by 3:00 PM Eastern Standard Time on or before 20 November 2026.
Interested respondents shall submit a Phase 1 Solution Brief consisting of no more than five written pages (5), excluding the cover page. Email is the official form of submission for responses. Surety letters may be attached without counting towards 5 page limit. Page format should be 8.5 x 11.
The Solution Brief shall include:
Evaluation & Selection Criteria
The Government will utilize a two-step, Qualifications-Based Selection (QBS) process mapped to the RAPID framework to select the Design-Builder. In accordance with PDB methodology, price will not be evaluated during the initial selection process. Selection is based on qualifications, experience, and collaborative capabilities.
Step 1: RAPID Phase 1 Equivalent
Evaluation of written Solution Brief to establish a short-list of the most highly qualified firms. Price is not evaluated in Step 1.
Step 2: RAPID Phases 2 Equivalent
Interactive Pitch Presentations/Interviews and evaluation of the Phase 1 PDB Price Proposal (short-listed teams only) to determine the final best-value selection.
Step 1: Statement of Qualifications Evaluation Factors
Factor 1: Past Relevant Experience
Factor 2: Team Composition and Organization
Factor 3: Project Approach and Understanding
Step 2: Pitch Presentation and Price Evaluation (Final Down-Select)
The Government may invite selected respondents to participate in an oral presentation or pitch. Phase 2 may assess the respondent’s technical approach, constructability, airfield-operational integration, phasing, site logistics, safety, environmental approach, risk management, collaboration capability, and preliminary schedule approach. Specific instructions will be provided with invitation to the pitch day.
Factor 1: Collaborative Capability and Cultural Fit
Factor 2: Real-Time Problem-Solving and Risk Management
Factor 3: Innovative Design-Build Solutions
Factor 4: Financial Capacity and Bonding
Final Selection and Award
Upon concluding presentations, the evaluation team will select the single most highly qualified Design-Builder. The Government will invite the selection firm to negotiate terms, Scope of Services, and a design/preconstruction fee for the Phase 1 OTA Agreement.
The Government will address the applicability of Davis-Bacon, prevailing-wage, and other labor requirements during the Pitch phase or before award; any requirements determined applicable will be incorporated into the resulting OTA.
Government Reservations
The Government reserves the right to:
Attachments
Send all submissions to: angela.whitley@us.af.mil and kristen.denlinger@us.af.mil
Notice of Expanded Opportunity, Follow-On Awards, and Multi-Base Utilization;
While the immediate requirement under this AOI is to Replace Circuit F-01 from Fowler Substation at Robins AFB, GA, offerors are advised that participation and successful evaluations under this AOI may provide significant strategic opportunities beyond the initial project.