ProposalWorkspaceFederal OpportunitiesDepartment of Defense

B21 Utilities & Site Improvements, Communications & Electrical Infrastructure, Dyess AFB OT Feasibility & Business Feedback

Active W9126G27R1CSY Sources SoughtDepartment of the Army
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

W076 Endist FT Worth of Department of the Army posted this Sources Sought on Oct 29, 2026. Responses are due Nov 12, 2026. NAICS 237130 (Power and Communication Line and Related Structures Construction), product or service code Y1NZ (Construction of Other Utilities). Place of performance: Texas. Solicitation number W9126G27R1CSY.

Solicitation details

General information

Solicitation number
W9126G27R1CSY
Notice type
Sources Sought
Place of performance
Texas

Classification

NAICS
237130Power and Communication Line and Related Structures Construction
Product or service
Y1NZConstruction of Other Utilities

Agency

Department
Department of Defense
Sub-tier
Department of the Army
Office
W076 Endist FT Worth

Description

From SAM.gov

SUBJECT: Sources Sought Notice/RFI – B-21 Utilities & Site Improvements, Communications and Electrical Infrastructure, Dyess AFB, Texas

DISCLAIMER: This Sources Sought (SS) is for planning and market research purposes only and does not constitute a Request for Proposals (RFP) or an Invitation for Bids (IFB). This notice is issued under the authority of 10 U.S.C. § 2808a (Other Transaction Authority for Construction and Repair) and is not subject to the Federal Acquisition Regulation (FAR). No solicitation is available at this time. The Government will not pay for any information submitted in response to this notice.

PURPOSE: The U.S. Army Corps of Engineers (USACE), Fort Worth District, is conducting active public market intelligence to gauge industry interest, capacity, and capability from commercial construction firms, design-builders, and Non-Traditional Defense Contractors (NDCs). The intent is to gather critical feedback regarding advanced commercial construction methodologies, project delivery risks, and acquisition preferences to support our upcoming project delivery selection.

PROJECT DESCRIPTION

This project adds electrical distribution infrastructure and fiber optic communications infrastructure to the existing base networks, supporting multiple new projects associated with the bed-down of the B-21 weapons system at Dyess Air Force Base with an estimated Construction Cost Limitation of $28,550,000. The communications component of this project includes the addition of single mode fiber optic cable in underground concrete encased duct, together with telephone system expansion. The electrical distribution component includes power cabling, also in underground concrete encased duct, as well as pole mounted power conductors and all associated transformers & equipment. Primary Underground Distribution includes new switchgear, cabling, duct banks, manholes & other associated appurtenances.

Facilities to be designed as permanent construction in accordance with Department of Defense Unified Facilities Criteria 1-200-01, General Building Requirements. This project will comply with Department of Defense antiterrorism/force protection requirements per Unified Facility Criteria 4-010-01, Department of Defense Minimum Antiterrorism Standards for Buildings, and Unified Facility Criteria 4-010-06, Cybersecurity of Facility-Related Control Systems.

INSTRUCTIONS TO INDUSTRY

  1. Review Attached Project Information Packet (PIP):
    Interested firms are directed to review the attached document. This packet provides comprehensive project requirements, constraints, and the complete questionnaire reference.
  2. Submit Responses via Microsoft Forms:
    To streamline the collection and analysis of industry feedback, responses to the market research questionnaire must be submitted electronically via the following link:
    Online Feedback Form: https://forms.osi.apps.mil/r/36mhctReuT
  3. Response Due Date:
    All electronic responses must be submitted via the online form no later than November 12, 2026, at 12:00 PM Central Time (CT).

POINTS OF CONTACT

Contract Specialist: Patricia Dickson, patricia.l.dickson@usace.army.mil, (817) 886-1095

Contracting Officer: Christopher R. Preston, II, Christopher.r.preston@usace.army.mil,  (817) 940-2482

Documents

1 file

Sign up free to download this file.

  • Project Information Packet -B21 Utilities Site Improvements-Comms and Electric.docx
    38 KB · Oct 29, 2026
    Download

Similar open bids

Same NAICS 237130

More from Department of the Army

Open bids, other NAICS codes