ARIZONA SCIENCE CENTER STORMWATER AND SEWER PIPE REPLACEMENT CONSTRUCTION MANAGER AT RISK SERVICES

Active PW26740069 RFQuConstruction - BuildingCity of Phoenix
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Phoenix (Arizona) posted this RFQu on Nov 19, 2026. Responses are due Dec 11, 2026. Category: Construction - Building. Solicitation number PW26740069.

Solicitation details

General information

Solicitation number
PW26740069
Notice type
RFQu
Place of performance
Arizona

Agency and category

Agency
City of Phoenix
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Phoenix is seeking a qualified Construction Manager at Risk (CMAR) to provide preconstruction services and complete construction services for the ARIZONA SCIENCE CENTER STORMWATER AND SEWER PIPE REPLACEMENT CONSTRUCTION MANAGER AT RISK SERVICES project. The selected CMAR will work as a team with the designer of record and City staff to ensure an efficient design approach for the project. The project site is located at 600 E. Washington Street. The estimated construction cost is **$8.2 million**.

The purpose of this project is to provide Construction Manager at Risk (CMAR) services for the replacement, and/or other remedy methods approved by the design engineer, of all existing drain, waste, vent (DWV), and storm drainage systems serving the Arizona Science Center. The project will address aging and deteriorated plumbing infrastructure throughout the facility to improve system reliability, maintain operational continuity, and support the long-term functionality of the building.

Scope

The Construction Manager at Risk will begin with the firm in an agency support role for preconstruction services. The CMAR will assume the risk of delivering the project through a Guaranteed Maximum Price (GMP) contract. The CMAR will be responsible for construction means and methods, and will be required to solicit bids from prequalified subcontractors to perform the work using the City's subcontractor selection process. The CMAR may also compete to self-perform limited amounts of work. The GMP must be submitted in MAG or CSI format or it will not be accepted.

Preconstruction phase services by the CMAR may include:

  • Provide detailed cost estimating and knowledge of marketplace conditions and budget validation at designated design milestones
  • Design-phase collaboration and constructability reviews, including procurement and subcontractor selection recommendations
  • Provide project planning and scheduling
  • Provide for construction phasing and scheduling that will minimize interruption to City operations and allow for facility to remain open and operational during construction activities
  • Pipe camera exploration and locating as needed to assist design process
  • Include pot holing as needed to identify system connections at building exterior
  • Provide add alternate for ADA upgrades, including adult changing stations
  • Value engineering and cost-saving analyses
  • Risk identification and mitigation planning
  • Provide long-lead procurement studies and initiate procurement of long-lead items
  • Assist in the permitting processes
  • Participate with the City in a process to set a goal for local and SBE participation and implement the local and SBE process

Construction phase services by the CMAR may include:

  • Following GMP acceptance, the CMAR will provide all construction services necessary to complete the work, including subcontractor management, quality control, safety oversight, schedule management, coordination with facility operations, and overall project delivery
  • Construction services shall include the replacement, and/or other remedy methods approved by design engineer, of all existing drain, waste, vent (DWV), and storm drainage systems serving facility. Remedy methods aside from replacement, may include: HDPE pipe using trenchless methods such as pipe bursting, cured in place pipe (CIPP) lining, or other alternative methods accepted by EOR and COP.
  • Prepare at least two (2) Guaranteed Maximum Price (GMP) proposals that each meet the approval of the City. Each GMP proposal will not exceed budget capacity for specified fiscal years.
  • Bid, award, and manage all construction related contracts while meeting City bid requirements including the local and SBE participation goal
  • Bond and insure the construction
  • The CMAR shall prepare and maintain an emergency response plan that identifies designated points of contact and escalation procedures. During the construction phase, the CMAR shall provide 24-hour, 7-day emergency response coverage and respond in person to emergency project related situations on-site within two (2) hours of notification
  • Include temporary restrooms as designed by EOR
  • The CMAR's services will continue through project closeout and warranty, including systems verification, punch-list completion, as-built documentation, and warranty management.

Additional information

**Submittal:** Firms must submit a *Statement of Qualifications* (SOQ) electronically through the City's Procurement Portal at https://procurement.opengov.com/portal/phoenix by **12:00 pm, Phoenix time, on Friday, December 11, 2026**. Submit only one SOQ, in .PDF format only. No hard copies will be accepted. A maximum of 12 pages is permitted.

**Bonding Statement:** As a separate PDF attachment, include a statement of the firm's bonding capacity from a Surety Company (A- or better for the prior four quarters).

**Evaluation:** The firm will be selected through a qualifications-based selection process. Points: General Information 150, Experience and Qualifications of the Firm 250, Experience of Key Personnel 250, Understanding of the Project and Approach 350, and Reference Checks 21 (in addition to the 1,000 points for the SOQ). No formal interviews will be conducted.

**Pre-Submittal Site Walk:** Monday, November 30, 2026 at 1:30PM at Arizona Science Center, 600 E. Washington Street, Phoenix, AZ 85004. Participants are to meet at the main entrance to the facility, located on the north side of the building.

**SBE:** Only firms whose physical business is located within Maricopa County are eligible to meet the SBE subcontracting goal, which will be set prior to construction of this project.

Documents

7 files

Subscribe to get these 7 documents.

  • SBE_CMAR_Clause_Launguage_PW26740069.pdf
    Download
  • ARIZONA_SCIENCE_CENTER_STORMWATER_AND_SEWER_PIPE_REPLACEMENT_CONSTRUCTION_MANAGER_AT_RISK_SERVICES.pdf
    Download
  • CONTRACTOR_REFERENCE_CHECK_PW26740069.docx
    Download
  • SBE_Letter_of_Intent_Form_PW26740069.pdf
    Download
  • SUBCONTRACTOR_SELECTION_PLAN.pdf
    Download
  • SBE_CMAR_Contractors_Statement_of_Utilization.pdf
    Download
  • NOTIFICATION_MEMO_(1)_-_PW26740069.pdf
    Download

Similar open bids

In Arizona

More from City of Phoenix

Open bids