CMAR for Morris K. Udall Park Expansion

Active 270167 RFQConstruction - BuildingCity of Tucson
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Tucson (Arizona) posted this RFQ on Nov 18, 2026. Responses are due Dec 11, 2026. Category: Construction - Building. Questions are due 2026-12-03 17:00. Solicitation number 270167.

Solicitation details

General information

Solicitation number
270167
Notice type
RFQ
Place of performance
Arizona
Questions due
2026-12-03 17:00

Agency and category

Agency
City of Tucson
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Pursuant to ARS Title 34, the City of Tucson is conducting a competitive One-Step Process to select a qualified construction manager/general contractor to provide design phase assistance for complete construction service as the Construction Manager at Risk for construction improvements for CMAR for Morris K. Udall Park Expansion. The estimated construction cost for the entire project is fourteen million dollars (**$14,000,000**).

It is the City of Tucson’s intention to initiate an RFQ for a CMAR to provide pre-construction and construction-phase services for improvements at Udall Park, located at 7200 E. Tanque Verde Rd., Tucson, Arizona.

The City invites interested firms to submit written Statements of Qualifications (SOQs) relating to this solicitation. A Screening Committee will evaluate firms’ qualifications and experience with similar projects. The top ranked firm(s) will then be invited to enter into negotiations with the City of Tucson.

Scope

Pre-construction Phase Services

Pre-construction Phase Services by the CMAR may include the following:

  • Team building/partnering
  • Management plans
  • Value analysis/engineering
  • Constructability reviews including identification of plan/specification conflicts, errors and omissions
  • Cost Modeling/Budgeting
  • Phasing Analysis/Sequencing/Construction Schedules
  • Estimating/Price/GMP
  • Building code/permitting analyses
  • Utility coordination with providers and existing infrastructure
  • Bid package strategy (subcontracting, SBE compliance)
  • Identification of specialized materials and ordering of long lead-time materials
  • Integration of means, methods and materials in relation to general, sustainable development

Construction Services

Construction Phase Services by the CMAR may include the following:

  • Team management/coordination
  • Underground utility location
  • Critical Path Scheduling
  • Submittal processes/coordination/management
  • Cost controls/change order management
  • Subcontract QC
  • Field management
  • Safety/QC programs
  • Special inspections and materials testing coordination
  • Project close out/warranty period services

The CMAR will be responsible for construction means and methods and may be required to solicit bids from pre-qualified subcontractors to perform the work.

The CMAR shall ensure that all existing facilities, infrastructure, utilities, and plants/ landscape features are properly protected in place during project construction.

The project will involve the upgrade and expansion of existing utility connections for electrical service, potable water, and reclaimed water.

The construction duration for this project is anticipated to be 12 to 18 months after permits have been approved.

Additional information

**Submission method:** Offeror must, no later than the Offer Submittal Deadline, submit its Offer electronically through the City’s online bidding system, https://procurement.opengov.com/portal/tucson-az

THE ENTIRE OFFER MUST BE IN "SUBMITTED" STATUS IN THE CITY’S ONLINE BIDDING SYSTEM IN ORDER TO BE CONSIDERED. Facsimiles or electronic mail proposals shall not be considered. Late submittals will be rejected.

At a minimum, your statement of qualifications should include the signed Offer form, signed copies of any solicitation addenda and your response to all evaluation criteria. It is recommended that submittals not exceed twenty (20) standard 8.5” by 11” pages.

A Screening Committee will evaluate firms’ qualifications and experience with similar projects. The top ranked firm(s) will then be invited to enter into negotiations with the City of Tucson.

The City requires an offer in response to this solicitation to be valid and irrevocable for ninety (90) days after the submittal due date and time.

The design and pre-construction phase of the project is underway. It commenced in September 2025 and is estimated to continue through November 2027.

Attachments:

  • *A - Offer and Acceptance*
  • *B - SBE Provisions Revised May 2024 Includes Subcontractor Modification Form*

Documents

3 files

Subscribe to get these 3 documents.

  • Offer_and_Acceptance.pdf
    Download
  • SBE_Provisions_Revised_May_2024_Includes_Subcontractor_Modification_Form.docx
    Download
  • CMAR_for_Morris_K._Udall_Park_Expansion.pdf
    Download

Similar open bids

In Arizona

More from City of Tucson

Open bids