California Department of Corrections and Rehabilitation (California) posted this IFB on Nov 16, 2026. Responses are due Jan 7, 2027. Category: Construction - Building. Questions are due 2026-12-10 17:00. Solicitation number 0000040952.
In general, the California Health Care Facility (CHCF) Potable Water Treatment System (PWTS) project will construct a new chlorination boosting system to supplement the disinfection of potable water delivered by the City of Stockton.
The project will construct a PWTS consisting of an above ground chemical storage tank, chemical injection system with required electrical, mechanical, metering and control equipment.
An approximately 900 square foot pre-engineered metal building, with site work and utilities, will also be constructed to house the chemicals and associated equipment.
Integration of the new Supervisory Control and Data Acquisition (SCADA) system with the existing SCADA system is also required.
Upon completion, the project must ensure compliance with the Environmental Protection Agency (EPA) and State Water Resources Control Board (SWRCB) drinking water quality standards related to chlorine residual at CHCF.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The California Department of Corrections and Rehabilitation (CDCR) intends to receive bids and award a contract for the construction of a new Potable Water Treatment System (PWTS) for the California Health Care Facility (CHCF) located in Stockton, California.
In general, the CHCF PWTS project will construct a new chlorination boosting system to supplement the disinfection of potable water delivered by the City of Stockton.
The project will construct a PWTS consisting of an above ground chemical storage tank, chemical injection system with required electrical, mechanical, metering and control equipment. An approximately 900 square foot pre-engineered metal building, with site work and utilities, will also be constructed to house the chemicals and associated equipment. Integration of the new Supervisory Control and Data Acquisition (SCADA) system with the existing SCADA system is also required.
Upon completion, the project must ensure compliance with the Environmental Protection Agency (EPA) and State Water Resources Control Board (SWRCB) drinking water quality standards related to chlorine residual at CHCF.
**Sealed proposals** for construction of the project will be received at the California Department of Corrections and Rehabilitation (CDCR), Office of Business Services, Contracts Management Branch, CDCR-CMB-Non-IT-Service-Bids@cdcr.ca.gov as specified in the Projected Timetable above, at which time they will be publicly opened and read aloud.
No bid will be considered unless it is made on the State's *Bid Proposal Form* which is non-transferable.
The Prime Contractor shall possess a valid "A - General Engineering Contractor" license issued by the California Contractors State License Board (CSLB) at the time of bid and for the duration of the project.
THIS BID PROPOSAL MUST MEET THE DISABLED VETERAN BUSINESS ENTERPRISE (DVBE) **3%** PARTICIPATION GOAL.
Bidder's security in the amount of ten percent (10%) of the bid, and appropriate licensing are **required** of all bidders.
The successful Bidder shall furnish bonds, insurance, and other documents as specified in the Instruction to Bidders.
The State's Estimate for the project is approximately **$3,380,000.00**.
Project Completion: 578 Days from Issuance of Notice to Proceed.