FIRE STATION 63 HAZARDOUS MATERIALS ABATEMENT PROJECT

Active Bid #2729 IFBEnvironmental ServicesCity of South San Francisco
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of South San Francisco (California) posted this IFB on Oct 14, 2026. Responses are due Nov 6, 2026. Category: Environmental Services. Solicitation number Bid #2729.

Solicitation details

General information

Solicitation number
Bid #2729
Notice type
IFB
Place of performance
California

Agency and category

Agency
City of South San Francisco
Category
008Environmental Services
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Project includes furnishing all labor, materials, equipment, supervision, and incidentals necessary to perform hazardous materials abatement at the existing building, including removal and disposal of identified asbestos-containing materials; lead-related work required by the Contract Documents; and associated selective removal, containment, cleanup, waste handling, and transportation.

Work shall be performed in accordance with the project Hazardous Building Materials Survey, Asbestos Abatement Specifications, Lead-Related Demolition Specifications, applicable regulations, and City requirements.

Scope

Specification for the abatement of identified asbestos-containing materials (ACM) throughout the single-story building located at 71 – 75 Camaritas Avenue in South San Francisco, California.

The following identified ACM are to be removed from the site building:

  • Approximately 1,000 SF of black mastic associated with 12” tan vinyl floor tiles located in the main room of the liquor store area of the building, containing 5% chrysotile asbestos;
  • Approximately 800 SF of wallboard joint compound located along the west and south walls of the main roof of the liquor store area and the restroom at the rear of the building, containing 2% chrysotile asbestos; and
  • Approximately 400 SF of wall texture on wallboard walls located along the west wall of the main roof of the liquor store area of the building, containing 2% chrysotile asbestos.

The scope of work under this section consists of furnishing all labor, materials, facilities, equipment, services, employee training and testing, permits and agreements necessary to perform the lead-related demolition and legal disposal of lead-containing paint (LCP) identified in the Pre-Demolition Hazardous Building Materials Survey, Liquor Store/Restaurant Building, 71 – 75 Camaritas Avenue, South San Francisco, California (SOCOTEC, September 29, 2026), and associated sample location maps/plans in accordance with the latest applicable federal, state, and local government regulations and these specifications.

The following materials were identified as lead-containing paints:

  • Tan paint on wood wall panels inside the Liquor Store
  • Brown paint on wood wall trim on the exterior of the building

The following material was identified as a lead-containing bulk material:

- 4” white ceramic tile countertop at front desk area of the Restaurant

Additional information

Obtain all special permits and licenses and make all required notifications to the appropriate government regulatory agencies (Bay Area Air District, etc.) required for performance and completion of the abatement work.

Prior to the start of abatement activities, the contractor shall submit one (1) copy of the work plan for removal of the identified ACMs, including a detailed plan of work procedures, work areas and proposed timelines for removal activities.

Submit within three (3) days of start date of contract, one (1) copy of the training documentation for each supervisor and worker who will be on-site for this project.

Any substitution in materials or methods to those specified shall be approved by the Client prior to use. Requests for substitution shall be provided in writing to the Client’s representative.

The contractor will not be released from the work area(s) until all clearance samples collected are determined to have fiber concentrations less than 0.01 f/cc.

Prior to final payment, the contractor shall finalize disposal receipts for all waste.

Documents

5 files

Sign up free to get these 5 documents.

  • 00_Division_00_FS63_Hazmat.pdf
    Download
  • 04_HBMS_Report.pdf
    Download
  • 01_Division_01_FS63_Hazmat.pdf
    Download
  • 02_Lead_Related_Demolition_Specifications.pdf
    Download
  • 03_Asbestos_Abatement_Specifications.pdf
    Download

Similar open bids

In California

More from City of South San Francisco

Open bids