Finance Department (California) posted this RFP on Oct 22, 2026. Responses are due Nov 19, 2026. Category: Facilities & Janitorial. Solicitation number RFP # 2718.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Municipal Plunge is equipped with a thermal solar panel system installed on the roof of the locker rooms that pre-heat pool water. After passing through the thermal solar panels, the pool’s water is further heated by two model P-2005A 1,999,000 BTU Raypak natural gas boilers. One was installed in 2026 (primary) and the other was installed in 2024 (backup). The facility’s water is also heated by four model RUC98 Rinnai tankless natural gas water heaters installed in 2015 that provide visitors with hot showers in the locker rooms.
The pool water is circulated using a 50-horsepower Reliance Model MP36G3401 pump manufactured by Baldor Electric that is controlled by a Variable Frequency Drive.
The City prefers the selected firm to respond to emergency repair calls for the heating and pumping equipment within 24 hours, including weekends.
If your firm is able to guarantee a response time and works on weekends, please state what the guaranteed response time is in your proposal along with confirming that your crew is available to work any day of the week.