RESD-PMDB 2026-13 CONSTRUCTION MANAGEMENT SERVICES-POTRERO FIRE STATION ¿ FACILITY REPLACEMENT

Active 0000040873 RFQuConstruction - BuildingCalifornia Department of General Services
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

California Department of General Services (California) posted this RFQu on Nov 5, 2026. Responses are due Dec 4, 2026. Category: Construction - Building. Solicitation number 0000040873.

Solicitation details

General information

Solicitation number
0000040873
Notice type
RFQu
Place of performance
California

Agency and category

Agency
California Department of General Services
Category
005Construction - Building
Source listing
Link with a plan

Description

From the agency listing

Advertisement for Request for Qualifications (RFQ)

Department of General Services

Real Estate Services Division

Project Management and Development Branch

RESD-PMDB 2026-13

CONSTRUCTION MANAGEMENT SERVICES

POTRERO FIRE STATION ¿ FACILITY REPLACEMENT

DEPARTMENT OF FORESTRY AND FIRE PROTECTION

1230 ROUND POTRERO ROAD

POTRERO, SAN DIEGO COUNTY, CALIFORNIA

Provide professional Construction Management services for the above project

All work shall be performed under and approved by a design professional, or contractor, licensed in the State of California.

The estimated cost of construction is approximately $23,587,800.00.

The estimated duration of this contract will be twenty-four (24) months.

Interested firms may view the RFQ on the California eProcure website (California State Contracts Register ¿ CSCR). Website link to the California eProcure website.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The Department of General Services (DGS), Real Estate Services Division (RESD), Project Management and Development Branch (PMDB) is requesting Statements of Qualifications (SOQ) from Construction Management firms, pursuant to Government Code §4525 et. seq.

Construct a standard 2-engine fire station on newly acquired 7 acre+/- site consisting of a 12-bed barracks/mess-hall, 3-bay apparatus building, and a generator/pump storage building with generator. Project site also includes a fuel dispensing system and fuel vault, vehicle wash rack, hose wash rack, 50,000 gallon water storage tank with pumphouse, and flammable storage building. Site work includes clearing, grading, drainage, paving, walkways, curbs, roads, well drilling and domestic water system with tank storage, septic system, electrical, telephone, irrigation, lighting, fencing, landscaping, all utilities and all appurtenances. This will be an essential services building that complies with LEED.

The estimated cost of construction is approximately **$23,587,800.00**.

The estimated duration of this contract will be twenty-four (24) months.

Scope

The successful firm shall provide professional construction management (CM) services and additional services as required for the above referenced project. The services may include, but not be limited to, construction project design review and evaluation, construction mobilization and supervision, bid evaluation, project scheduling, cost-benefit analysis, claims review and negotiation, and general management and administration of a construction project.

The firm selected for this work and all sub-consultants are precluded from participating in any of the construction or other competitively bid contract work on this project.

Additional information

Submission

One (1) electronic copy of the SOQ shall be uploaded by the submitting firm to the following DGS Box.com site: https://dgscloud.app.box.com/f/6150ae25187e447283f85af386f28b6a

The SOQ electronic copy shall be in **PDF format**. Hand delivered or dropped off, e-mailed files, and other electronic transmissions will **NOT** be accepted.

Submittal Deadline: **Friday, December 4, 2026, at 5:00 P.M.**

Selection

Firms will be selected on the basis of written responses to this RFQ and an oral interview.

Typically, three firms with the highest scores will be selected for the "short list." These firms will be invited for an interview and asked to make an oral presentation on their firm and its qualifications and experience. [...] Upon completion of all interviews, a single firm will be selected.

Retention

Ten percent (10%) percent retention will be held for all progress payments made to consultant.

Documents

2 files

Subscribe to get these 2 documents.

  • AD_2026-13_CM_Potrero_Fire_Station_Replace_Facility.pdf
    Download
  • RFQ_2026-13_CM_Potrero_Fire_Station_Replace_Facility.pdf
    Download

Similar open bids

In California

More from California Department of General Services

Open bids