City of Norwich (Connecticut) posted this IFB on Nov 3, 2026. Responses are due Nov 20, 2026. Category: Construction - Building. Solicitation number 27-41.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Purchasing Agent, City of Norwich will receive proposals for 15 North Cliff Street, Norwich, CT until 4:00 P.M. prevailing time on November 20, 2026 at which time they will be opened on the Procurement website and be available to view.
This project is being funded through the Property Rehabilitation Program and, or HUD Lead Based Paint Hazard Control in Priority Housing Program.
Bid: Heating System Replacement
Heating Apartment 1 First Floor:
Remove existing Gas Boiler and Hot-water heater-Replace with the following:
All bids are to be submitted via the City of Norwich Procurement Portal. **Proposals will not be accepted by mail, in person or by email.** All forms and associated documents must be uploaded through the procurement portal.
A pre-bid conference will be held on November 12, 2026 at 10:00 A.M. at the project location. Your attendance at that meeting is recommended to bid on this project.
The basic bid package **required** items: the *Instruction Sheet with signed Bidders Certification*, *Payment Request form* filled out and totaled, *Non-Collusion Affidavit*, proof of insurance, proof of licensure as a home improvement contractor in the State of Connecticut, proof of licensure as a Lead Abatement contractor in the State of Connecticut (if applicable), and copies of all addendum sheets properly signed. The omission of any items listed in the Basic Bid Package will result in the disqualification of the bid.
No Bidder may withdraw its bid within sixty (60) days of the bid opening date. The firm whose proposal is accepted must provide a certificate of insurance within ten working days from the date the Notice of Award is issued. Performance and payment bonds are required prior to contract signing.
This project is allotted 15 calendar days to complete the specified scope from notice to proceed.