Town of New Milford (Connecticut) posted this RFP on Nov 13, 2026. Responses are due Dec 10, 2026. Category: Architecture & Engineering. Questions are due 2026-11-30 08:00. Solicitation number OpenGov-95e1029a.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Town of New Milford seeks the services of a professional engineering firm licensed in the State of Connecticut with extensive bridge and highway design and construction experience to provide Engineering Services for the rehabilitation of the Boardman Road Bridge No. 05312 over Housatonic River.
The Town of New Milford is requesting proposals from qualified professional firms, licensed in the State of Connecticut, to provide engineering services for the Town.
The proposed work shall fully conform with and be executed in accordance with the requirements of the Connecticut Department of Transportation State Local Bridge Program guidelines.
The goal of the engineering design project is to produce a complete set of CTDOT approved design plans, specifications and bid documents for the bridge replacement project. Work shall include all surveys, studies, investigations, reports, environmental permitting, local permitting, cost estimates, documents, designs, plans, specifications, utility coordination/relocation, railroad coordination, right-of-way acquisition assistance (temporary or permanent as needed), public informational meetings, bid documents, construction award recommendations and other tasks necessary to complete the overall design and secure all local, State and Federal approvals. Work will conclude upon the completion of the Bidding Phase with an acceptable construction award.
In addition to meeting the State Local Bridge Program guidelines, the rehabilitation work shall include, but not limited to:
The consultant shall thoroughly investigate the site, review State Bridge Inspection Reports and make recommendations to the Town of New Milford for the most economical design that satisfies the objectives established previously herein and in compliance with SLBP guidance.
The latest State of Connecticut Bridge Inspection Report for this structure may be obtained directly from the Connecticut Department of Transportation.
**Proposals** must be submitted electronically through the Town's Procurement Portal, OpenGov Procurement, no later than **3:30 pm** on Thursday, December 10, 2026. Late proposals will not be accepted and will be rejected.
All questions related to this Proposal shall be submitted in writing through the OpenGov Procurement Question/Answer Tab via the Town's e-Procurement portal, no later than Monday, November 30, 2026 by 8:00 am.
Proposals will be evaluated based on the following criteria:
Proposals must be valid for ninety (90) days.
Based upon the outcome of this process, the Town will award a base contract that ends with a signed contract for Construction activities. Design Services During Construction (DSDC) will be negotiated to a mutually agreeable rate to the awarded consultant when those activities are needed.
The consultant shall provide a certificate of insurance evidencing the following required minimum coverages: General Liability per occurrence $1,000,000; Personal Injury $1,000,000; Aggregate $2,000,000; Professional liability $1,000,000. Umbrella /Excess $ 2,000,000.
Liquidated damages in the amount of Two Hundred Dollars ($200.00) per day are hereby agreed upon and shall be assessed against the Consultant for each day that the established project milestones are not met.