27B-016 CR 42 at Buena Vista Blvd Mast Arm Replacement

Active 27-016-Bonfire-2 ITBConstruction - Heavy & CivilMarion County
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Marion County (Florida) posted this ITB on Nov 16, 2026. Responses are due Dec 16, 2026. Category: Construction - Heavy & Civil. Solicitation number 27-016.

Solicitation details

General information

Solicitation number
27-016-Bonfire-2
Notice type
ITB
Place of performance
Florida

Agency and category

Agency
Marion County
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

This project consists of replacing the Mast Arm at the intersection of County Road 42 (CR 42) and Buena Vista Blvd.

Scope

This project consists of replacing the Mast Arm at the intersection of County Road 42 (CR 42) and Buena Vista Blvd.

The term "Work" shall mean whatever is done by or required of CONTRACTOR to perform and complete its duties under the Contract Documents, including the following: construction of the whole or a designated part of the Project; furnishing of any required surety bonds and insurance; and the provision or furnishing of labor, supervision, services, materials, supplies, equipment, fixtures, appliances, facilities, tools, transportation, storage, power, permits and licenses required of CONTRACTOR, fuel, heat, light, cooling and all other utilities as required by this Agreement.

CONTRACTOR shall achieve Substantial Completion of the Work no later than **69** calendar days from the Start Date and measured by calendar days. CONTRACTOR shall achieve Final Completion no later than **90** calendar days from the start date noted on the Notice to Proceed.

Final Completion is defined as having all Work completed, all Punch List Items corrected, final inspection completed and accepted by COUNTY.

Additional information

Contract Documents

Marion County Bid # 27B-016, the Offer, Project Bid Scope and/or Specifications, Plans and drawings, Any/all Addenda as issued in support of this Bid, Recorded Bonds as required, Certificate of Insurance and Notice to Proceed.

Time and liquidated damages

CONTRACTOR shall be issued the NOTICE TO PROCEED AFTER ALL CONTRACT DOCUMENTS ARE FILED AND RECORDED TO COUNTY'S SATISFACTION AND PERMITS ISSUED. Liquidated damages shall accrue at **$1,318.00** per calendar day.

Insurance

CONTRACTOR shall provide, within the timeframe noted in the Award Letter, a Certificate of Insurance, issued by a company authorized to do business in the State of Florida and with an A.M. Best Company rating of at least A-. All policies must include all requirements listed below, reference the project number and show Marion County as additional insured.

  • Workers Compensation and Employer's Liability: STATUTORY limits; Employer's Liability not less than **$100,000** each accident, **$500,000** disease policy limit and **$100,000** disease each employee.
  • Commercial General Liability: not less than **$1,000,000** each occurrence for Bodily Injury, Property Damage and Personal and Advertising Injury; **$2,000,000** each occurrence for Products and Completed Operations.
  • Business Automobile Liability: not less than **$500,000** combined single limit each accident.

Retainage

For contracts in excess of Two Hundred Thousand Dollars ($200,000), COUNTY may retain from each progress payment made to CONTRACTOR an amount not exceeding five (5%) percent of the payment as retainage.

Warranty

When not specifically identified in the bid documents, the warranty shall commence upon the date of COUNTY's issuance of final payment to CONTRACTOR and shall be for a period of one (1) year.

Documents

15 files

Subscribe to get these 15 documents.

  • Bid Bond Form.pdf
    Download
  • Bid Book CR 42 at Buena Vista Blvd MAR.pdf
    Download
  • Conflict of Interest Statement Form.pdf
    Download
  • Disclosure of Subcontractors and Suppliers.pdf
    Download
  • Drug Free Workplace Certificate.pdf
    Download
  • Final Waiver and Release of Lien.pdf
    Download
  • ITB - General Terms and Conditions.pdf
    Download
  • Map CR 42 at Buena Vista Blvd MAR.pdf
    Download
  • Pay App Template.xlsx
    Download
  • PaymentWorks Onboarding Letter.pdf
    Download
  • Sample Application and Certificate for Payment AIA G702.pdf
    Download
  • Signal Plans CR 42 at Buena Vista Blvd MAR.pdf
    Download
  • Similar Work Detail Form.pdf
    Download
  • Standard General Conditions.pdf
    Download
  • Vendor Information Form.pdf
    Download

Similar open bids

In Florida

More from Marion County

Open bids