Pasco County (Florida) posted this IFB on Nov 13, 2026. Responses are due Dec 22, 2026. Category: Construction - Heavy & Civil. Solicitation number IFB-KM-27-028.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Pasco County Board of County Commissioners invites vendors to submit bids for the installation of a new mast-arm traffic signal at the intersection of Chapel Pines Boulevard and Curley Road in Wesley Chapel, Florida, as per the Contract Documents.
The proposed signal consists of a single signal pole located at the Southwest corner of the intersection.
This project will consist of a proposed traffic signal at the Chapel Pines Boulevard and Curley Road intersection. The proposed signal consists of a single signal pole located at the Southwest corner of the intersection.
Contract plan set (Signal Plans)
The signal installation shall be in accordance with the latest versions of the FDOT "Standard Specifications for Road and Bridge Construction", FDOT "Roadway and Traffic Design Standards", FDOT "Minimum Specifications for Traffic Control Signals and Devices", and "Manual of Uniform Traffic Control Devices" except as specified herein.
At locations where underground utilities are in close proximity to the signal pole foundation, as determined by the Engineer, the Contractor shall hand dig the first four feet of the hole for the pole foundation. The Contractor shall confirm the absence of utility conflicts at each pole location prior to ordering poles.
A mandatory pre-signalization meeting shall be held prior to start of the project. All material submittals shall be provided at the meeting.
Prior to digging, the Contractor shall determine the exact locations of all utilities and shall notify the "Sunshine State One Call" notification center not less than 48 hours, nor more than five days in advance of any of the Contractor's work activity which may impact any utility facility.
Frontier requests the Road Contractor to notify the Frontier field representative 72 hours prior to start of construction.