Pasco County (Florida) posted this IFB on Oct 27, 2026. Responses are due Dec 1, 2026. Category: Construction - Heavy & Civil. Solicitation number IFB-SP-27-021.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
This solicitation intends to contract with a single Contractor for the demolition and removal of the Key Vista Boardwalk and related construction activities, the work includes replacement of the fixed dock with a floating dock; in accordance with the plans, specifications, and all other Contract Documents prepared by Coastal Design Consultants, Inc.
Demolition and removal include all the labor, MATERIALS, and WORK associated with but not limited to the following items as shown on the Construction Drawings:
- Removal of UTILITY pipe, structures and apparatus.
The CONTRACTOR shall submit to the ENGINEER a schedule of demolition and methods of demolition to be used on each item prior to executing the WORK covered by this section.
The CONTRACTOR shall backfill all demolition areas approximately to existing ground level. [...] The CONTRACTOR shall provide protection necessary to prevent damage to existing improvements within the project area indicated to remain in place or on adjacent properties.
The CONTRACTOR shall deliver to the ENGINEER, prior to final acceptance or final payment, four (4) sets of blue line “As-Built” Drawings signed and sealed by a Florida Registered Land Surveyor, and one (1) electronic disc copy of “As-Built” Drawings (PDF and AutoCAD).
The CONTRACTOR shall present his/her Maintenance of Traffic plan at the Preconstruction Conference.
The CONTRACTOR shall be required to obtain a registered land surveyor, licensed in the State of Florida to provide required survey construction staking and as-built information. All costs associated with construction survey shall be included in the CONTRACT Lump Sum Price.
The cost of bonds and insurance, and any other preconstruction expense necessary for the start of the WORK, excluding the cost of construction MATERIALS, shall be included.
The CONTRACTOR shall be responsible for determining the WORK required by inspecting the site prior to bidding.