City of Hollywood (Florida) posted this ITB on Oct 26, 2026. Responses are due Dec 3, 2026. Category: Construction - Heavy & Civil. Solicitation number OpenGov-2ae19844.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Demolition and installation of process systems and equipment at the City of Hollywood Water Treatment Facility. Major work elements include removal and replacement of lime slaker systems no. 2 and 3, including associated pumps, tanks, piping, valves, electrical, controls, and structural repairs; demolition and replacement of the filter surface wash system; demolition and replacements of the sodium hexametaphosphate (SHMP) feed system, including new equipment pads, trench grating, electrical, controls, and flow monitoring; and demolition and replacement of sludge pump piping, flushing water line, and reconfiguration of the existing standby sludge pump.
Demolition and installation of process systems and equipment at the City of Hollywood Water Treatment Facility. Major work elements include removal and replacement of lime slaker systems no. 2 and 3, including associated pumps, tanks, piping, valves, electrical, controls, and structural repairs; demolition and replacement of the filter surface wash system; demolition and replacements of the sodium hexametaphosphate (SHMP) feed system, including new equipment pads, trench grating, electrical, controls, and flow monitoring; and demolition and replacement of sludge pump piping, flushing water line, and reconfiguration of the existing standby sludge pump.
All work shall include start-up, testing, and commissioning as required to provide fully operational systems.