2027-05 CAT Plant Riverside Ferry Dock

Active PE-33123-NONST-2027-000000013 RFPConstruction - Heavy & CivilChatham Area Transit Authority
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Chatham Area Transit Authority (Georgia) posted this RFP on Nov 17, 2026. Responses are due Dec 11, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-11-30. Solicitation number PE-33123-NONST-2027-000000013.

Solicitation details

General information

Solicitation number
PE-33123-NONST-2027-000000013
Notice type
RFP
Place of performance
Georgia
Questions due
2026-11-30

Agency and category

Agency
Chatham Area Transit Authority
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Chatham Area Transit Authority (CAT) is soliciting responses from qualified vendors to Design and Build Ferry Dock and Shelter on Plant Riverside.

Separate, sealed Competitive Proposals for furnishing all professional services, materials, labor, tools, equipment, and incidentals necessary for the design, permitting and construction of the aforementioned project will be received by the Chatham Area Transit Authority, herein referred to as "CAT", at the offices of the CAT.

Scope

The project is located behind the parking garage and hotel at 500 West River Street in Savannah, Georgia. The project consists of design, permitting and construction of 15'x20' concrete platform supported by concrete piles, a 6' wide x 80' long aluminum ADA gangway and a 20' wide x 120' long concrete floating dock with concrete piles. It also includes a 14' x 24' ± landing shelter for ferry passengers located on the existing Riverwalk. The final design of the shelter shall conform to design shown on the Sottile & Sottile, 2022.

For the purposes of this proposal, the owner provides herein general information, layouts, dimensions, and end-user requirements for the resulting project. The owner is interested in and will consider offeror alternate ideas, materials, suggestions, or refinements which will effectively improve the quality of the overall project while maintaining a reasonable cost.

Additional information

Submission

One (1) unbound original, three (3) copies, and an electronic copy of the response must be mailed or hand delivered to: Victor Colon, Procurement Manager, Chatham Area Transit Authority, 900 E. Gwinnett St., Savannah, GA 31401. Any response delivered to CAT after the time specified will not be considered.

Bid security

Each proposal must be accompanied by a cashier's check, certified check, or a bid bond prepared on accepted form, duly executed by the offeror, with good and sufficient surety approved by Owner in the amount of **five per cent (5%)** of the cost in the proposal.

Evaluation criteria

  • Experience and Performance: 50%
  • Project Approach: 40 %
  • Cost: 10 %

Required with the response

  • Most recent three (3) years comprehensive financial statements, audited version if your business structure requires such. **THIS IS MANDATORY.**
  • Statement regarding the staffing availability of your business to handle the scope of services in this solicitation.
  • Evidence of current Commercial General/Professional Liability insurance providing insurance for bodily injury, property damage, personal injury and advertising injury, with limits of not less than **$1,000,000**.
  • Complete, sign, and return the pertinent portions of Attachments B - G.

Contract term

CAT anticipates awarding a three (3) year contract to the selected vendor(s). The estimated project timeline is estimated to be eighteen 18 months.

Documents

1 file

Subscribe to get this document.

  • 2027 _ 05 _ RFP _ CAT PLANT RIVERSIDE FERRY D.pdf
    Download

Similar open bids

In Georgia

More from Chatham Area Transit Authority

Open bids