This project includes the construction of the Windsor Parkway Sidewalk Project (S2161). The project will install 6’ sidewalk with 2’ wide landscape strip and curb and gutter on the south side of the street from the intersection of Windsor Parkway and Dalmer Road to existing sidewalk at 727 Windsor Parkway. The project will include approximately 2,940 LF of sidewalk, drainage upgrades which include but is not limited to 1,739 LF of 18” RCP along the south side of Windsor Parkway, 16 new catch basins, one (1) reconstructed catch basin, one (1) new drop inlet, and one (1) manhole, extension of an existing culvert, two (2) parapet walls, and other associated improvements.
The project will be funded through the Sandy Springs TSPLOST program.
General Requirements
Standards and Specifications
Unless otherwise directed, all work performed shall be in accordance with the Georgia Department of Transportation Standard Specifications, Construction of Transportation Systems (current edition).
Permitting
This project will be constructed under City of Sandy Springs Public Works Permit No. CITY-26-22.
This project is authorized by the U.S. Army Corps of Engineers Regional General Permit 34 (SAS-2026-00146). The Contractor shall comply with all applicable U.S. Army Corps of Engineers permit requirements, conditions, approvals, and mitigation measures associated with the Work [...].
The Contractor shall be responsible for obtaining all other required permits and providing appropriate notifications to the City prior to the commencement of work.
Utility Coordination and Site Preparation
The Contractor shall perform all clearing and grubbing necessary to prepare the site for utility relocation activities. This includes coordination with the City and affected utility owners to ensure proper access and sequencing of work.
Following site preparation, the Contractor shall provide adequate workspace and scheduling support to allow the following utility work, including but not limited to:
The Contractor shall maintain continuous coordination with all utility companies throughout the process to minimize delays and avoid conflicts between utility work and subsequent construction activities.
Submission
Bids shall only be accepted online through the Bonfire Portal at: https://sandysprings.bonfirehub.com/projects/264072/details. Any proposal submitted in any other format (email, paper, fax, mail, etc.) will not be accepted for any reason.
Contractor Qualifications
The Contractor must perform at least 51% of work and must be a pre-qualified Prime Contractor listed by the Georgia Department of Transportation.
Contract Term
Contract Duration: **365 Calendar Days**
Bonds
Bonds will be required for this project if proposal is over **$100,000.00**. Bid Bond (If Bid Price Exceeds $100,000, 5% of Bid Price). Upon award of contract the following items shall also be submitted: Performance Bond, Payment Bond, Certificate of Insurance, Signed Contract.
Required documents
Failure to submit the required bid documents, including the *City Bid Form*, *Bid Schedule*, *Bid Price Certification* and *Request for References*, may result in the bid being deemed non-responsive and the bid shall be rejected.
Other
Contractor Shall not be permitted to be working on the following Government Holidays: (New Years Day Holiday, Martin Luther King Jr. Day Holiday, Presidents Day Holiday, Memorial Day Holiday, Independence Day, Labor Day Holiday, Columbus Day Holiday, Thanksgiving Day Holiday, Day After Thanksgiving Holiday, and Christmas Day Holiday)