Windsor Parkway Sidewalk Project

Active 27-020-Bonfire ITBConstruction - Heavy & CivilCity of Sandy Springs
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Sandy Springs (Georgia) posted this ITB on Nov 23, 2026. Responses are due Dec 29, 2026. Category: Construction - Heavy & Civil. Solicitation number 27-020.

Solicitation details

General information

Solicitation number
27-020-Bonfire
Notice type
ITB
Place of performance
Georgia

Agency and category

Agency
City of Sandy Springs
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

This project includes the construction of the Windsor Parkway Sidewalk Project (S2161). The project will install 6’ sidewalk with 2’ wide landscape strip and curb and gutter on the south side of the street from the intersection of Windsor Parkway and Dalmer Road to existing sidewalk at 727 Windsor Parkway.

Scope

The project will include approximately 2,940 LF of sidewalk, drainage upgrades which include but is not limited to 1,739 LF of 18” RCP along the south side of Windsor Parkway, 16 new catch basins, one (1) reconstructed catch basin, one (1) new drop inlet, and one (1) manhole, extension of an existing culvert, two (2) parapet walls, and other associated improvements.

Grading Complete shall include the following provisions and their cost:

  • Saw cutting of concrete and asphalt pavement to construct the project.
  • Including but not limited to the removal of asphalt and concrete pavement, the removal of concrete walkways and driveways, the removal of granite, concrete and stone curbing, miscellaneous stone, site materials, including vegetation (trees, stump’s, shrubs and ground cover) and other debris removal required to construct the project.
  • The supply and grading of clean, suitable fill and plant top soil material to construct the sidewalk, greenbelt and side slope areas. Clean topsoil to be supplied in greenbelt and side slopes areas at 2” depth. No rock or construction debris can be used to construct fill slopes.
  • The relocation and repair of any irrigation facilities and yard lights damaged during project construction activities.
  • The Contractor shall file & maintain utility locates.
  • The Contractor shall provide independent testing services for the project which will include sub-grade compaction and concrete testing as directed by the Engineer.
  • The Contractor must provide a video of the project area before the project begins and after the project is complete.

Sod installation shall include a 2 year warranty.

Additional information

The Contractor will be permitted to sublet a portion thereof, but shall perform, with his/her own organization, work amounting to not less than fifty-one percent (51%) of the total Contract cost, including materials, equipment, and labor.

Lane closures is only permitted from 9:00 am to 4:00 pm and work is permitted only during weekdays (Monday through Friday) between the hours of 8:00 am to 5:00 pm.

A traffic control plan shall be submitted two (2) weeks prior to any work for review and approval by the Owner representative.

Charges shall be assessed against any money due or that may become due the Contractor at the rate of $500 per calendar day.

Documents

5 files

Subscribe to get these 5 documents.

  • 27-020 Windsor Parkway Sidewalk Construction 11.23.26.pdf
    Download
  • CITY-26-22 STAMPED APPROVED DRAWINGS Mon Aug 3 2026 10-34-56 - rev 1.pdf
    Download
  • FINAL SAS-2026-00146 RGP 34 VL (1).pdf
    Download
  • S2161 Special Provisions.pdf
    Download
  • Vendor Responsibility Questionnaire (VRQ).docx
    Download