Etowah Water & Sewer Authority (Georgia) posted this RFQu on Nov 9, 2026. Responses are due Dec 18, 2026. Category: Construction - Heavy & Civil. Solicitation number PE-33656-NONST-2027-000000002.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Separate sealed Bids for furnishing all materials, labor, tools, equipment and appurtenances necessary for the **Dawson Forest WRF Expansion to 2.5 MGD** project are planned to be received by the Engineering & Construction Department at Etowah Water & Sewer Authority, Dawsonville, Georgia 30534 on February 25, 2027.
Pre-qualification of Bidders is **required** for the Project. **ONLY BIDS SUBMITTED BY PROPERLY PRE-QUALIFIED BIDDERS WILL BE OPENED.** The work will be awarded in one Contract.
**THE PROJECT** consists of furnishing all materials and equipment and performing all labor necessary for the expansion of the existing Dawson Forest WRF to 2.5 MGD with new equipment and appurtenances as detailed in the specifications and as shown on the contract drawings. The project generally consists of the following major components of work and appurtenances:
1. Installation of Mechanical Bar Screen No. 2 and Appurtenances at the Influent Pump Station;
2. Miscellaneous Upgrades to Existing SBR Tanks No. 1 & No. 2;
3. Construction of SBR Tanks No. 3 & No. 4 and Appurtenances;
4. Installation of Post EQ Pump No. 3;
5. Installation of additional Disc Filter Equipment;
6. Installation of additional UV Equipment;
7. Miscellaneous Upgrades to Existing Aerobic Digesters No. 1 & No. 2;
8. Conversion of Two Abandoned SRB Tanks to Aerobic Digesters No. 3 & No. 4;
9. Miscellaneous Upgrades to Existing Aerobic Digester Blower Building; and
10. Miscellaneous Civil, Electrical and Instrumentation Improvements.
**Pre-qualification:** Beginning on **November 11, 2026**, a copy of the application and qualification requirements can be obtained from the Etowah Water & Sewer Authority Engineering & Construction Department located at 1162 Highway 53 East, Dawsonville, Georgia 30534 or via email electronically from Tim Collins at tcollins@etowahwaterga.gov. Completed pre-qualification applications for bidding will be received electronically in PDF format until **5:00 p.m., local time, December 18, 2026**. All applicants submitting pre-qualification documentation will be notified of their status by January 8, 2027.
Pre-qualified Contractors will be notified when copies of Contract Documents are available.
**A BID BOND** in the amount of **10 percent (10%)** of the total base Bid shall accompany each Bid submitted. The Bid Bond shall be prepared on the Bid Bond form attached to the Contract Documents or a Surety Company's Standard Bid Bond, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of Georgia and listed in the latest issue of U.S. Treasury Circular 570.
**THE SUCCESSFUL BIDDER** for this Contract will be required to furnish a satisfactory Performance Bond and Payment Bond each in the amount of **100 percent** of the Bid and liability insurances per the Contract Documents, Section 00 73 16 Insurance Requirements.
Bid terms shall remain valid for ninety days from the date of the Bid opening.