Muscogee County School District (Georgia) posted this RFP on Nov 9, 2026. Responses are due Dec 15, 2026. Category: Construction - Building. Solicitation number PE-55046-NONST-2027-000000028.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
We are seeking a General Construction Contractor to be our Project Construction Manager at Risk. The Project is to be performed pursuant to the AIA A133-2019 Standard Form of Agreement with payment based on the cost of work, plus a fee and with a guaranteed maximum price. The successful proposer (the Construction Manager at Risk (CM)) shall serve as the general construction contractor and construction manager for the Project.
The Project will include interior and exterior painting, at seven (7) schools, as our budget permits, and may include replacing some flooring, ceilings and lighting and other similar/related work.
The services will consist of cost estimating, constructability analysis and scheduling and phasing of the renovation and painting. The CM will assist the School District and the project Architect in finalizing the phasing and scheduling of the work, and cost estimating and value engineering of the Project.
The CM will begin by performing pre-construction services with the Project Team. Services will include conceptual and detailed budgeting and estimating, constructability reviews, evaluation of alternative materials and equipment and systems for performance of the work. The CM will work with the School District to finalize the scheduling of the work. As design proceeds, the CM will also conduct a review of the plans and specifications for completeness and cost effectiveness of the details and materials shown for the work. [...] On completion of the plans and specifications, or at an earlier date if mutually agreed upon, the CM will develop the GMP for the Project. Provided that the GMP is equal to or less than the School District's approved budget, the contract amount (GMP) will be established and construction may proceed. The contract will be for the cost of the work plus a fee, with a guaranteed maximum amount.
**Submission method:** Sealed proposals will be received by the Muscogee County School District, in the Office of the Director of Construction, 5661 Lorenzo Road, Columbus, Georgia 31904, until **10:30 a.m., Tuesday, December 15, 2026**. Proposals received after this time will not be accepted.
Submit one (1) original and six (6) identical copies of the proposal. The proposals shall be in a loose-leaf binder with tabs clearly identifying the contents.
Evaluation factors
A **Mandatory** Pre-Proposal Conference will be held. If you do not attend, your proposal will not be accepted.
**Insurance required** if awarded the contract: Workers Comp Statutory; General Liability **$1,000,000**; Automobile Liability **$1,000,000**; Excess Liability Umbrella **$5,000,000**; Builder's Risk 100% of the Contract Amount (GMP).
Satisfactory proof that the proposer will be able to furnish 100% Performance and Payment bonds at the execution of the contract is required (Letter from Surety Company). Proposals must remain in effect for at least 45 (forty-five) days after date of opening of proposals.