Request for Quote Three Phase Pad Mount Transformer

Active THOMASVILLE-DF52AE08 RFQUtilities & EnergyCity of Thomasville
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Thomasville (Georgia) posted this RFQ on Nov 20, 2026. Responses are due Dec 9, 2026. Category: Utilities & Energy. Questions are due 2026-12-01 10:00. Solicitation number THOMASVILLE-DF52AE08.

Solicitation details

General information

Solicitation number
THOMASVILLE-DF52AE08
Notice type
RFQ
Place of performance
Georgia
Questions due
2026-12-01 10:00

Agency and category

Agency
City of Thomasville
Category
018Utilities & Energy
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Thomasville, Georgia requests that interested parties submit informal bids for the procurement of a Three-Phase Pad Mount Transformer designed for underground distribution system. Bids will be accepted until the date and time listed below and will be awarded to the responsive and responsible bidder whose bid, conforming will all the material terms and conditions of the RFQ, is the lowest in price.

The primary objective of this procurement is to acquire a three-phase pad mount transformer; a critical component used in the distribution of electrical power. The transformer will be installed within the City’s utility network, ensuring stable and efficient power delivery to municipal, commercial, or residential customers as required.

Scope

The scope of work encompasses the supply and delivery of the transformer to a specified location within the state of Georgia (GA), with all associated costs and logistics to be managed by the selected contractor.

Key requirements for this opportunity include the provision of a new or professionally remanufactured, high-quality three-phase pad-mount transformer that adheres to industry standards and any specifications outlined in the solicitation documents. Vendors are expected to demonstrate their ability to deliver the equipment within the stipulated timeframe and provide any necessary documentation or certifications to verify compliance with applicable codes and regulations. The expected deliverable is the fully functional transformer, delivered and ready for installation by the City of Thomasville’s utility department.

This specification provides standardization of physical and electrical requirements for three-phase, self-cooled, oil-immersed, pad-mounted transformers designed for underground distribution systems.

  • Transformers shall be rated 1500 kVA and provided for delta-delta connection to 60 hertz alternating current for the following voltages as specified in the order: 12470 DELTA high voltage and 2400 DELTA low voltage.
  • Transformers shall be shipped with a single transformer per pallet and delivered on a flat-bed truck situated for side unloading.
  • Certified test reports for each transformer, identified by serial number and rated kVA, must be submitted to utility within 30 days of delivery of transformer to utility.
  • Each transformer shall be guaranteed by vendor against failure due to any cause, except misapplication, abuse, or acts of God, for a minimum of one (1) year after delivery of transformer to utility or after delivery of certified test report to utility, whichever is later.

Additional information

Submission

Proposers shall submit one (1) signed original response to the RFQ and must be either enclosed in a sealed plain envelope, with “RFQ #2026-331: THREE-PHASE PAD MOUNT TRANSFORMER” on the outside and must be filed with the Purchasing Administrator of the City of Thomasville, located at 111 Victoria Place, Thomasville, Georgia 31792 by December 9, 2026, at 11:00 AM EST. In the event you choose to mail your proposal, it should be mailed to Lori H. McCardle, Purchasing Administrator, P.O. Box 1540, Thomasville, Georgia 31799.

Bids must include:

  • *Cost Proposal Form*
  • *W-9 Form*
  • *Vendor Application*
  • *Addenda Acknowledgement Form*

Late bids will not be considered. Bids received after the bid deadline will be filed unopened.

Evaluation

Bids will be evaluated based on:

  • Cost
  • Compliance with bid requirements
  • Time of delivery

Bid pricing should remain effective for sixty (60) days after the bid opening.

The City of Thomasville pays Net 30 from invoice date.

Documents

1 file

Subscribe to get this document.

  • 2026-331 Request for Quote Three Phase Pad Mount Transformer (Due by 12_09_26 at 11_00 AM EST).pdf
    Download

Similar open bids

In Georgia

More from City of Thomasville

Open bids