Cobb County-Marietta Water Authority (Georgia) posted this IFB on Nov 20, 2026. Responses are due Dec 22, 2026. Category: Construction - Heavy & Civil. Questions are due 2026-12-14 10:00. Solicitation number PE-66365-NONST-2028-000000039.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Sealed Bids will be received by the Cobb County-Marietta Water Authority at 1170 Atlanta Industrial Drive, Marietta, Georgia 30066 [...] for the Project known as: WEST SIDE LOOP SECTION 3 36-INCH WATER MAIN REPLACEMENT
The Owner of the project is Cobb County-Marietta Water Authority. The Engineer for the Project is Freese and Nichols, Inc.
The work described by these specifications is in Southwest Cobb County, Georgia. The purpose of this project is to replace the existing 36-inch prestressed concrete cylinder pipe (PCCP) and some 36-inch ductile iron pipe (DIP) with approximately 37,000 LF of 36-inch zinc-coated, double bonded-joint and double poly-wrapped DIP.
The project begins at the intersection of Casteel Road and Friendship Church Road and travels south continuing onto Villa Rica Road, intersecting SR 360/Macland Road and continuing south onto Old Villa Rica Road. The water main then turns east onto Macedonia Road and runs to just before Barrett Parkway with a tie-in to CCMWA’s existing 36-inch DIP water main.
**Sealed Bids** will be received until **10:00 AM, local prevailing time, on Tuesday, December 22nd, 2026**, at which time and place the Bids will be publicly opened and read aloud. Bids received after the designated time will not be considered.
Only those contractors that are pre-qualified with the Cobb County-Marietta Water Authority to construct 36-inch diameter and larger water mains at the time of the first publication of this notice will be allowed to receive plans and specifications and bid this project. Each Bidder must be a State of Georgia licensed Utility Contractor at the time of the Bid.
Each bid must be submitted on the bid form in the contract documents, in accordance with the Instructions to Bidders. Each bid must be accompanied by a Bid Bond [...] in an amount equivalent to **five percent (5%)** of the total amount payable by the terms of the contract or, in lieu thereof, a certified check, cashier's check, or cash in equal amount. Each Bid must also be accompanied by a notarized non-collusion affidavit for the Bidder.
The successful Bidder will be required to furnish performance and payment bonds with the executed Agreement.
The time allowed for Substantial Completion is 1430 consecutive calendar days, and the time allowed for Final Completion and readiness for final payment is 1460 consecutive calendar days from the date of commencement.
Advertisement and bid phase information for the Project can be found at http://construction.freese.com. All questions must be submitted on this site.
All Bids will remain subject to acceptance for sixty days after the day of the Bid opening. The Owner reserves the right to reject all Bids, to waive informalities and re-advertise.