Change Order Notice I-25-2005 RM Tollway (I-88), Bridge Recon at CNR, Phase II Engineering Services

Active 27-557THA-ENGCO-B-54543 RFPArchitecture & EngineeringIllinois State Toll Highway Authority
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Illinois State Toll Highway Authority (Illinois) posted this RFP on Oct 20, 2026. Responses are due Nov 20, 2026. Category: Architecture & Engineering. Solicitation number 27-557THA-ENGCO-B-54543.

Solicitation details

General information

Solicitation number
27-557THA-ENGCO-B-54543
Notice type
RFP
Place of performance
Illinois

Agency and category

Agency
Illinois State Toll Highway Authority
Category
007Architecture & Engineering
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Documents

1 file

Sign up free to get this document.

  • 2005 Supplement Change Order Notice.pdf
    Download

Similar open bids

In Illinois

More from Illinois State Toll Highway Authority

Open bids