Jones HS: Sump Pumps Replacement- Open to contracted pre-qualified pool for VARIOUS TRADES ONLY

Active 26-1493 ITBConstruction - BuildingChicago Public Schools
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Chicago Public Schools (Illinois) posted this ITB on Nov 12, 2026. Responses are due Nov 24, 2026. Category: Construction - Building. Questions are due two (2) business days prior to bid closing. Solicitation number 26-1493.

Solicitation details

General information

Solicitation number
26-1493
Notice type
ITB
Place of performance
Illinois
Questions due
two (2) business days prior to bid closing

Agency and category

Agency
Chicago Public Schools
Category
005Construction - Building
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Chicago Public Schools - Department of Procurement invites bids for Jones HS: Sump Pumps Replacement. 1) Provide labor to remove the existing vacuum pump station that was flooded out 2) Furnish and install one (1) new Duplex vacuum pump 208-230/460-3-60 with 24 Volt secondary voltage.

Scope

Vacuum Pump Station

  • Provide labor to remove the existing vacuum pump station that was flooded out.
  • Furnish and install one (1) new Duplex vacuum pump 208-230/460-3-60 with 24 Volt secondary voltage.
  • Furnish and install two (2) new 2hp, 12.5 cfm @ 5.5” vacuum, 3450 rpm air pumps.
  • Furnish and install two (2) new 3⁄4 water pumps 30 gpm @ 20 psi, 3450 rpm.
  • Furnish and install one (1) new 304 stainless steel tank.
  • Furnish and install one (1) new Nema 1 mechanical alternator.
  • Furnish and install one (1) new Nema 4/12 UL listed panel including mag starters, through the door lockable main disconnect, circuit breakers, lighted HOA switches, 115v CC.
  • Disconnect/reconnect existing piping.
  • Disconnect/reconnect exiting electrical.
  • Start up and test operation.

Condensate Station by Pool AHU

  • Provide labor to remove the existing condensate station that was flooded out.
  • Furnish and install one (1) new Duplex Condensate station 3 phase with 24 gal. 304 stainless steel tank.
  • Furnish and install two (2) new 1/3hp, 3450 rpm pumps.
  • Furnish and install one (1) new Nema 1 mechanical alternator.
  • Furnish and install one (1) new Nema 4/12 UL listed panel including mag starters, through the door lockable main disconnect, circuit breakers, lighted HOA switches, 115v CC.
  • Disconnect/reconnect existing piping.
  • Disconnect/reconnect exiting electrical.
  • Start up and test operation.

Condensate Station by AHU – 1

  • Provide labor to remove the existing condensate station that was flooded out.
  • Furnish and install one (1) new Duplex Condensate station 3 phase with 304 stainless steel tank.
  • Furnish and install two (2) new 1/2hp, 3450 rpm pumps.
  • Furnish and install one (1) new Nema 1 mechanical alternator.
  • Furnish and install two (2) new stainless steel suction isolation valves.
  • Furnish and install one (1) new Nema 4/12 UL listed panel including mag starters, through the door lockable main disconnect, circuit breakers, lighted HOA switches, 115v CC.
  • Disconnect/reconnect existing piping.
  • Disconnect/reconnect existing electrical.
  • Start up and test operation.

Contractor to field verify dimensions and specifics of all projects listed above before placing a bid. Not responsible for contractor errors as a result of non-field verification.

Materials and installation must comply with CPS Standards and Specifications as listed on a) SECTION 22 35 00 Domestic Water Pump b) SECTION 22 14 29 Sump Pump c) SECTION 22 11 16 Domestic Water Piping d) SECTION 23 21 23 Hydronic Pumps

Secure job site overnight if work is not completed in one day.

If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed.

All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. The contractor is to remove and dispose of materials torn out and any construction debris. All trash must be removed off-site by the contractor.

Clean the surrounding area and make sure all is swept of debris.

Additional information

  • Bid Cover Sheet must be completed in its entirety, signed, and dated.
  • Bids must be submitted online through **EUNA/Bonfire**.
  • All work is to be performed during normal working hours.
  • Warranty information, when applicable, is required with your bid submission.
  • $25,000 or more bid price: Bidder must be signatory to the relevant union, per the terms of Bidder’s contract and applicable Project Labor Agreement(s).
  • $25,000 or more bid price: Bidder must provide a Bid Bond equal to **5%** of the bid price from Bidder’s surety company.
  • $50,000 or more bid price: Bidder must include in their Bid the premium cost for the Payment and Performance Bond in the full amount of their contract. If Bidder fails to furnish the performance bond within seven (7) days after acceptance of the Bidder’s Bid by the Board, the Bid acceptance may be rescinded and the Bidder may be precluded from further Bidding with the Board.
  • $75,000 or more bid price, Bidder must complete relevant MBE/WBE at time of bid, even if Bidder is self-performing. Forms and instructions are available at: https://www.cps.edu/procurement/business-enterprise-development/
  • All bonds must be issued by a surety acceptable to the Board and Licensed by the State of Illinois.
  • All questions/requests must be received two (2) business days prior to bid closing.

Documents

2 files

Subscribe to get these 2 documents.

  • Jones HS Sump Pumps Cover Sheet.docx
    Download
  • Jones HS Sump Pumps Invitation to Bid.docx
    Download

Similar open bids

In Illinois

More from Chicago Public Schools

Open bids