Iowa State University (Iowa) posted this RFQ on Nov 18, 2026. Responses are due Dec 1, 2026. Category: Laboratory & Scientific. Questions are due 2026-11-25 14:00. Solicitation number RFQ-1001546.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
On behalf of the Mechanicial Engineering Department, Iowa State University is seeking qualified bids for an automated, high-throughput materials testing system capable of providing tensile stress strain curves based on indentation data in alloy metal samples across a wide range of temperatures.
Iowa State University seeks an automated, high-throughput system that can test the tensile properties of samples of metallic alloys across a broad range of temperatures. The desired system will be a single system or a base system plus compatible modules that can provide accurate stress-strain curves based on indentation and can perform automatic indentation over a large surface area.
Required Specifications
Delivery is strongly preferred to be within eight weeks after receipt of the purchase order.
Required attachments
Suppliers must direct all questions and comments in reference to this RFP/RFQ to the University Representative using the QUESTIONS tab via this e-procurement system.
Evaluation criteria
The evaluation of this RFP/RFQ may be based upon, but not limited to:
Be specific with your answer in this section as the delivery, installation, and training timeline is a critical evaluation factor. Incomplete answers may result in a lowered evaluation score.
Offers that do not include literature as requested by be considered non-compliant based on an inability to properly evaluate Supplier offer.
Contractor may not withdraw its Proposal for a period of ninety calendar days after the time designated for receipt of proposals unless the Proposal contains an obvious and documented error for which it would be a manifest injustice to require Contractor to perform pursuant to such terms.
Subscribe to get these 6 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.