Cheney Pump Station Transformer Replacement

Active 260295 IFBConstruction - Heavy & CivilCity of Wichita
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

City of Wichita (Kansas) posted this IFB on Nov 20, 2026. Responses are due Dec 4, 2026. Category: Construction - Heavy & Civil. Questions are due For comments that affect bid items and/or quantities: Noon Tuesday prior to bid opening. For questions and comments requiring clarification only: Noon Wednesday prior to bid opening.. Solicitation number 260295.

Solicitation details

General information

Solicitation number
260295
Notice type
IFB
Place of performance
Kansas
Questions due
For comments that affect bid items and/or quantities: Noon Tuesday prior to bid opening. For questions and comments requiring clarification only: Noon Wednesday prior to bid opening.

Agency and category

Agency
City of Wichita
Category
006Construction - Heavy & Civil
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Notice is hereby given that sealed proposals for constructing Cheney Pump Station Transformer Replacement will be received (electronically) in the office of the City Purchasing Manager, 12th Floor, City Hall, 455 North Main, Wichita, Kansas, prior to 10:00 O'CLOCK A.M., FRIDAY December 4, 2026, at which time the bids will be opened publicly and read aloud and tabulated by the Board of Bids and Contracts for consideration by the City Council.

Scope

The electrical work shall include all labor, materials, tools, transportation, equipment, services and facilities, required for the complete, proper and substantial installation of all electrical work shown on the plans, and/or outlined in these specifications.

Proposed construction phasing notes

1. Install new switchboard MSB-1, pad mounted transformer and associated primary and secondary feeders. Ready primary feeder for cut over and connection to medium voltage switchgear.
2. Install branch circuit feeders from MSB-1 and leave ready for cutover reconnection to existing loads.
3. Coordinate schedule for cut over shut down with owner. Shut down maximum downtime must not exceed 24 hours.
4. Provide temporary power for SCADA and other critical loads.
5. Connect all new feeders.
6. Remove existing feeders.

The work on this project shall take place while the existing pump station is in service. Any work that will cause disruption at the operating pump station will require communication and coordination with Water Treatment Staff before the work is performed. The plant must be able to maintain operations during construction.

Additional information

Proposals are to be submitted through the City’s Procurement Portal (wichita.gov/procurementportal). Bidder shall affix the following project number to the bid envelope or file attachment 448-2026-029868.

A bid bond in the amount of **five percent (5%)** of the total bid or an annual bid bond is **required** prior to bid opening. See Section 102.3 of the City of Wichita Standard Specifications for further information.

Performance bond forms, in the amount of one hundred percent (100%) of the contract, must be furnished by the successful vendor. Labor & material payment bond forms, running to the State of Kansas in a sum of not less than the total of the contract, must be furnished by the successful vendor.

Bid Award will be based on the Lowest and Best Total Net Bid from a Responsible and Responsive vendor.

The work order on this project shall be issued 30 (thirty) calendar days after the date on which the contract for this project has been awarded to the successful bidder. The work on this project shall be completed within 60 (sixty) working days from date of beginning work.

Bids submitted may not be withdrawn for a period of 60 days following the opening of this Request for Bid.