City of Wichita (Kansas) posted this IFB on Nov 20, 2026. Responses are due Dec 11, 2026. Category: Construction - Heavy & Civil. Questions are due Noon Tuesday prior to bid opening (comments that affect bid items and/or quantities); Noon Wednesday prior to bid opening (questions requiring clarification only). Solicitation number 260298.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Notice is hereby given that sealed proposals for constructing Wichita Valley Center Flood Control Project Levee “J” Toe Drain Installation will be received (electronically) in the office of the City Purchasing Manager, 12th Floor, City Hall, 455 North Main, Wichita, Kansas, prior to 10:00 O'CLOCK A.M., FRIDAY December 11, 2026, at which time the bids will be opened publicly and read aloud and tabulated by the Board of Bids and Contracts for consideration by the City Council.
The City of Wichita's Standard Specifications are required provisions for the furnishing of all materials and doing all work to complete the above referenced project (west of Meridian, north of 53rd Street North).
The City of Wichita's Standard Specifications are required provisions for the furnishing of all materials and doing all work to complete the above referenced project, and are hereby made a part of these provisions as if fully set forth herein. Said Standard Specifications shall control except as modified by the following Special Provisions.
All work on the project shall be completed by **August 31, 2027**. Working days will be charged as provided for in the Standard Specifications once the work order is issued. The non-availability of materials shall not prevent working days from being assessed.
The work order on this project shall be issued at the Contractor’s request. Conflicts with utilities shall not have an effect on the completion date.
Payment for the bid items will be as a lump sum/measured quantity amount based on the bid quantities and unit prices in the bid proposal.
All approved materials shall conform to the appropriate requirements set forth in the Standard Specifications and shall have been previously approved by the Material Review Board (MRB).
Proposals are to be submitted through the City’s Procurement Portal (wichita.gov/procurementportal).
A bid bond in the amount of five percent (5%) of the total bid or an annual bid bond is **required** prior to bid opening. See Section 102.3 of the *City of Wichita Standard Specifications* for further information.
Performance bond forms, included in the bid package are to be used, in the amount of one hundred percent (100%) of the contract must be furnished by the successful vendor.
A labor & material payment bond forms, included in the bid package are to be used, running to the State of Kansas in a sum of not less than the total of the contract, must be furnished by the successful vendor.
Bid Award will be based on the Lowest and Best Total Net Bid from a Responsible and Responsive vendor.
Bids submitted may not be withdrawn for a period of 60 days following the opening of this Request for Bid.
The Successful Bidder will be required to furnish a Certificate of Insurance (prior to the Purchase Order, Agreement, or Contract being issued). The Certificate of Insurance must be submitted within ten (10) days after notification of award.
Subscribe to get these 2 documents.