Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
What the bid is for
Contractor to provide all labor, materials, equipment, supplies, insurance, etc., necessary to renovate Cugle house including, electrical, kitchen upgrades and flooring within- Patapsco Valley State Park, located at 4463 Bonnie Branch Rd, Ellicott City, MD 21043 in Howard County.
This procurement has been designated for Certified Small Business Enterprises.
Scope
Kitchen Renovation
- Submit shop drawing to Project Engineer for new kitchen layout.
- Remove and properly dispose of all existing kitchen cabinets, sink basin, faucets, countertops, backsplashes and any associated accessories.
- Install the new cabinets according to the manufacturer's written instructions. Provide and install new kitchen cabinets, to include all base / wall cabinets, toe kick, pulls and hardware, finished ends for cabinet ends etc. for complete installation.
- Install new 1 ½" countertops approximately (30 SF), 1" x 3" backsplash around entire new countertop area, and new base kickboard.
- Reconnect plumbing and install the new stainless steel single bowl sink and faucet according to the manufacturer's written instructions.
- Install a standard size dishwasher 24" x 24" to be install to the left side of sink base cabinet according to the manufacturer's written instructions, to include all plumbing connections, dishwasher to be provided by the state.
- Provide and install (1) ¼ horsepower garbage disposal and install to manufactured written instructions.
- Provide and install (1) over the range microwave and install per manufactured written instructions.
- Remove approximately 250 SF of flooring it down to sub floor in existing in kitchen/ dining.
- Prepare existing sub floor and install approximately 650 SF of flooring engineered vinyl flooring in kitchen, dining room and living room areas.
Electrical
- Provide and install approximately thirty (31) AFCI receptacles, ten (10) (GFCI) receptacles, twelve (12) single-pole switches, two (2) three-way switches, eleven (11) light fixtures, five (5) Ceiling Fan with lights and (6) hardwire smoke/CO detectors, three (3) dedicated 220 volt lines for range, dryer and well pump. Approximately (80) total fixtures. To include new conductors, boxes, and accessories.
- Remove and replace any conductors that are not code compliant.
- Cut and repair drywall as needed, cut holes in drywall as needed to run wires to make a path to termination point. Unit Price #1.
- Install new 1/2" sheetrock to all exposed wall surfaces, approximately 500 SF. Secure Sheetrock with screws and adhesive. Sheetrock shall be taped, three coats of joint compound, and sanded to a ready for paint condition.
- Prime and paint drywall repairs as needed after patch Unit Price #2.
- Removal and proper disposal of all debris off state property.
Unit Price Items
- Unit Price #1 – Drywall Repair/ patch: Contractor shall insert a cost per square foot x estimated 500 SF = Total Unit Price #1 to repair/ patch drywall in accordance with applicable code requirements.
- Unit Price #2 – Prime and Painting: Contractor shall insert a cost per square foot x estimated 500 SF = Total Unit Price #2 to Prime and Paint walls in accordance with applicable code requirements.
All quantities and sizes listed above are approximate. The Contractor shall be responsible for obtaining measurements for the project and bidding purposes.
Additional information
**Submission:** Bid pricing must be completed on the Pricing tab within the eMMA system. Failure to complete and upload all attachments; as well as failure to submit bid pricing through eMMA digital line items wholly may result in the rejection of this bid. All bid response documents are to be submitted as ONE ATTACHMENT, using the *Bid Response Cover Sheet* as the cover sheet.
Qualifications
- The Contractor shall be a licensed general contractor in the State of Maryland in accordance with COMAR Regulations.
- The contractor shall have a minimum of three (3) years' experience performing similar installation projects.
- All electrical work shall be performed by a licensed electrical contractor approved to perform work within Howard County.
**Basis of Award:** To the responsible bidder that submits the lowest responsive and responsible Total Bid amount, Alternates will be added (or deducted) in accordance with Instructions to Bidders for Construction Contracts.
**Bonds:** Upon request by the DNR Procurement Officer, the following must be provided by way of email. Hard copies must be provided to DNR within 10 days of the initial request: Performance Bond (Attachment W) and Payment Bond (Attachment X).
The contract shall be for a period of 90 calendar days. It is understood that the bid price will be firm for a time period of one hundred twenty (120) calendar days from the bid opening date. The Contractor will be liable for Liquidated Damages of **$250.00** per calendar day.
The Contractor shall guarantee his/her work for a period of two (2) years from the date of acceptance.
Any additional site visits can be arranged with the Park Manager at Rob Dyke At 410-461-5005, DNR Project Manager John Nuth 410-980-3368