Brookline Housing Authority (Massachusetts) posted this RFQ on Nov 4, 2026. Responses are due Nov 20, 2026. Category: Construction - Building. Solicitation number BD-27-1133-1133C-1133L-135093.
The project consists of the complete removal and replacement of an existing exterior deck and the existing leaking/rotted bulkhead located beneath and adjacent to the deck.
The existing deck framing is positioned directly over the bulkhead access area, preventing proper operation, inspection, maintenance, and use of the bulkhead.
The new construction must correct this condition.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The Brookline Housing Authority, the Awarding Authority, invites written quotes from Contractors for the 11 Harris Street property 167-1 Development for the Brookline Housing Authority in Brookline Massachusetts, in accordance with the documents prepared by the Brookline Housing Authority.
The Project consists of: Replacement of the rear decking and the bulkhead to the rear of the property.
The work is estimated to cost **$ 25,000**.
The Project consists of: Replacement of the rear decking and the bulkhead to the rear of the property.
Quotes are subject to M.G.L. c.149 §44A (2)(B) & to state prevailing wage rates as required by M.G.L. c.l49 §§26 to 27H inclusive.
Written Quotes will be received until **Friday November 20th 2:00 p.m.**
All Quotes should be delivered to: 90 Longwood Avenue, Brookline, MA 02446 or via email to Chris Devoll at cdevoll@brooklinehousing.org and received no later than the date & time specified above. Quotes may be hand delivered, mailed or emailed.
Contract Documents will be available at: The Brookline Housing Authority via email by contacting Chris Devoll at cdevoll@brooklinehousing.org
The job site and/or existing building will be available for inspection between 10A.M. and 11A.M Tuesday November 10th. This pre-bid walkthrough is **MANDATORY**.
No individual appointments will be made. Interested contractors will be required to attend the job site inspection on the above date.