Department of Fish and Game (Massachusetts) posted this RFQ on Nov 9, 2026. Responses are due Dec 8, 2026. Category: Architecture & Engineering. Questions are due 2026-11-18 13:00. Solicitation number BD-27-1046-DFW-FWE11-135223.
Northeast District Survey Services Crane Pond WMA-Pillsbury Street, Georgetown
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
To obtain a survey of the Division of Fisheries and Wildlife (DFW) property to the requirements of EEA Land Acquisition Policy – Specifications for Surveys – January 6, 2015 (COMMBUYS MBPO#: PO-26-1046-COM-COM1-39690).
Total length of line to be surveyed is approximately 1,000 feet with 6 iron pins to be located and/or installed.
The survey is needed to locate and monument the correct bound of DFG owned property between the abutters of 199 Pond Street and 31 Pillsbury Street, and to confirm a suspected encroachment along the northwest boundary line of the WMA. The line to be surveyed is approximately 1,000 feet long.
Locate all course changes and install iron pins as indicated on attached detail map, including iron pins to either side of apparent encroachment of structure on abutting land at 199 Pond Street.
Set iron pipes or capped iron pins (hereinafter, “boundary markers” or “monumentation” at the corners of these parcels, and add additional boundary markers on any course over 500 feet, and as shown on attached diagrams. Include the placement of a magnetized spike (i.e MagSpike), magnetized disk or other magnetic marker at the base of the hole which has been created for the monumentation before it has been set.
Preparation of a plan suitable for recording with the registry of deeds that shows area surveyed, the location of the monuments recovered, and newly set boundary markers, including (a) a mylar copy of the plan; (b) two (2) paper copies; and a digital submission of the plan (preferably the CADD file) as required by the policy noted above.
In addition, if applicable, the following items must be located and shown on the submitted plan:
The surveyor will be responsible for recording the completed survey with appropriate registry with reference to Book 4606; Page 221 unless otherwise directed by the District.
There will be a pre-work meeting, in person or on-line, with the District Stewardship Biologist (1/2-1 hour) prior to beginning any survey assignment, the purpose of the meeting is to review any information that the District has regarding such assignment and to confirm survey objectives.
This RFQ is restricted to vendors on the Department of Fish & Game’s Departmental Contract FWE-SURVEY-26 (COMMBUYS MBPO: PO-26-1046-COM-COM1-39690).
Responses are to be submitted electronically via the “Create Quote” function contained in COMMBUYS system.
A complete bid response is to include:
Only responsive proposals that meet the submission requirements will be evaluated, scored, and ranked by the evaluation team according to the evaluation criteria: Bid Amount; Satisfactory Completion of Previous Work; Small Business Purchasing Program (SBPP) Participation.
**All survey work is to be completed no later than May 31, 2027.** Final invoice to be submitted no later than July 15, 2027.
Estimated Contract Start Date: December 15, 2026.