Department of Fish and Game (Massachusetts) posted this RFQ on Nov 9, 2026. Responses are due Dec 8, 2026. Category: Architecture & Engineering. Questions are due 2026-11-18 13:00. Solicitation number BD-27-1046-DFW-FWE11-135214.
Connecticut Valley District Survey Services Montague WMA-Hillside Drive, Montague
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
To obtain a survey of the Division of Fisheries and Wildlife (DFW) property to the requirements of EEA Land Acquisition Policy – Specifications for Surveys – January 6, 2015 (COMMBUYS MBPO#: PO-26-1046-COM-COM1-39690).
Total length of line to be surveyed is approximately 800 feet with up to 7 iron pins to be located and/or installed.
All survey work is to be completed no later than May 31, 2027. Final invoice to be submitted no later than July 15, 2027.
Locate all course changes and install iron pins as indicated on attached detail map.
Recover or set iron pipes or capped iron pins (hereinafter, “boundary markers” or “monumentation” at the corners of these parcels, and add additional boundary markers on any course over 500 feet. Include the placement of a magnetized spike (i.e MagSpike), magnetized disk or other magnetic marker at the base of the hole which has been created for the monumentation before it has been set.
Preparation of a plan suitable for recording with the registry of deeds that shows area surveyed, the location of the monuments recovered, and newly set boundary markers, including (a) a mylar copy of the plan; (b) two (2) paper copies; and a digital submission of the plan (preferably the CADD file) as required by the policy noted above. If providing the plan in Massachusetts State Plane is not practical for this area the surveyor will need to locate one on the ground feature (i.e. utility pole) which could be identified from the Massachusetts 2014 USGS Color Ortho Imagery to allow the CADD file to be accurately geo-referenced in ArcMap.
In addition, if applicable, the following items must be located and shown on the submitted plan;
The surveyor will be responsible for recording the completed survey with appropriate registry with reference to the Deed referenced at Book 6631; Page 38 unless otherwise directed by the District.
There will be a pre-work meeting, in person or on-line, with the District Stewardship Biologist (1/2-1 hour) prior to beginning any survey assignment, the purpose of the meeting is to review any information that the District has regarding such assignment and to confirm survey objectives.
This RFQ is restricted to vendors on the Department of Fish & Game’s Departmental Contract FWE-SURVEY-26 (COMMBUYS MBPO: PO-26-1046-COM-COM1-39690).
Responses are to be submitted electronically via the “Create Quote” function contained in COMMBUYS system.
A complete bid response is to include:
Only responsive proposals that meet the submission requirements will be evaluated, scored, and ranked by the evaluation team according to the evaluation criteria:
Estimated Contract Start Date: December 15, 2026.
Subscribe to get these 4 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.