City of Lebanon (New Hampshire) posted this RFP on Nov 19, 2026. Responses are due Dec 17, 2026. Category: Construction - Building. Questions are due 2026-12-04. Solicitation number 2026-RFx-064.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Lebanon, New Hampshire (the CITY) Recreation, Arts, and Parks Department (the DEPARTMENT), invites qualified contractors (the Contractor) to participate in the renovation of the Storrs Hill Ski Lodge building located at 60 Spring Street, Lebanon, NH. This exciting project will provide: additional conditioned interior gathering and instructional space; new toilet rooms; upgrades to the kitchen, ski-patrol, and office spaces; replacement of exterior decks and entries, and; upgrades to the building mechanical and electrical and communications systems. [...]
This specific Request for Proposals (RFP) solicits qualified Contractors to offer Design-Build proposals for evaluating, replacing, and upgrading the mechanical (heating, air cooling, and ventilation) systems, the electrical & communications (electrical, fire alarm, phone, and wifi) systems, and the plumbing systems at the lodge.
The MEP CONTRACTOR shall be responsible for the:
The scope of work is more fully detailed in the plans, specifications, and scope of work documents.
Specific Tasks
1. General.
- Evaluate existing MEP systems for code compliance, condition, and suitability for re-use.
- Evaluate plans for new rooms, equipment, fixtures, and appliances.
- Provide the owner with options for upgrades and replacements to MEP systems that will meet the Owner's goals at the least cost, both in up-front installation and ongoing operations costs.
- Once Owner decisions on specific upgrades and replacements are made, provide the Owner with a detailed Cost Not to Exceed quote for the chosen work.
- Upon notice to proceed, secure and pay for required trades permits.
- Upgrade and replace MEP systems per plan.
2. Schedule. The Contractor will work closely with the CITY's Project Manager (PM) to develop a construction schedule that leads to the efficient prosecution of the overall project, to include providing for other contractors to complete their work in a sequenced, timely and efficient manner.
3. Trades Coordination. The Contractor will communicate and coordinate with all other trades who may need to be performing work either at the same time as the Contractor, or whose work is dependent upon the Contractor finishing or partially finishing the Contractor's own work.
4. Electrical, Alarm, and Communications Systems: electrical; fire detection, alarm, and notification; internet (hard wired jacks, Wi-Fi point/s jacks and power, TV power receptacles); security cameras and alarms.
5. Mechanical Systems: heating system and bathroom and kitchen ventilation upgrade to meet code. The owner desires air cooling for all spaces to support summer programing.
6. Plumbing System: upgrade to meet code; alter existing supply, drains, and vents to accommodate new bathroom and kitchen arrangements; provide and install new fixtures.
7. Manufacturer's Technical Information. The Contractor shall provide to the CITY one (1) hard copy and one (1) .pdf formatted digital copy of all installation and operating and maintenance manuals for equipment and fixtures installed in the project.
8. As-Built Record Drawings. The Contractor shall provide to the CITY one (1) hard copy of a marked-up floor plan.
**RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:** https://LebanonNH.gov/Bids
The City of Lebanon reserves the right to reject any and all Bids and to waive any irregularity in Bidding. The successful Bidder will be required to furnish the necessary Bonds and Insurance Certificates. The City will award this project based on the City's discretion and may or may not include any or all bid alternatives. All work included in this bid is dependent upon the bid amounts and available funding. Actual quantities are subject to change and will be based upon actual field measurements taken during construction.
If a Contractor does not have in house resources to complete all of the MEP work, the Contractor may subcontract with another contractor who can provided the licensed expertise, but the prime Contractor must be responsible in every way for the work of the subcontractor. The Contract will be with the prime Contractor.
Note 1: Due to constraints within the OpenGov software, we were unable to change the words Bid and Bidder to Proposal and Proposer/Contractor in all instances. Contractors are directed to infer and interpret the words Bid and Bidder to mean Proposal and Proposer or Contractor.
Note 2: Due to constraints within the OpenGove software, we were unable to remove references and provisions related to transportation construction. Contractors may ignore the following sections: 4.5, 4.17, 4.18, 4.20, and references to a Bid Bond in section 4.16.
Subscribe to get these 4 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.