OMH Hutchings Psychiatric Center Replace Boilers in Buildings 16 & 17 including Asbestos and Hazardous Materials Abatement

Active 2139815 IFBConstruction - BuildingDormitory Authority of the State of New York
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Dormitory Authority of the State of New York (New York) posted this IFB on Oct 14, 2026. Responses are due Nov 19, 2026. Category: Construction - Building. Solicitation number 2139815.

Solicitation details

General information

Solicitation number
2139815
Notice type
IFB
Place of performance
New York

Agency and category

Agency
Dormitory Authority of the State of New York
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

DASNY is soliciting bids for multiple prime contracts for the Replace Boilers in Buildings 16 & 17 including Asbestos and Hazardous Materials Abatement project at Hutchings Psychiatric Center.

Scope

The scope of work includes, but is not limited to the following:

Mechanical

Remove and replace (with new) two existing boilers and associated piping as per contract documents. All Hazardous materials abatement activities.

The estimated construction cost range is between **$1,700,000 and $1,900,000**.

Electrical

Remove and replace (with new) existing boilers and associated wiring and equipment as per contract documents.

The estimated construction cost range is between **$130,000 and $150,000**

Plumbing

Provide new water heater and water heater expansion tank, Thermostatic Mixing Valve, RPZ backflow preventer, make new copper piping connections and insulate new piping, firestopping where required.

The estimated construction cost range is between **$200,000 and $220,000**

Additional information

A complete set of Contract Documents may be viewed and/or purchased online from Camelot Print and Copy Centers. Only those Contract Documents obtained in this manner will enable a prospective bidder to be identified as an official plan holder of record.

The bidder or its principals shall have a minimum of five (5) years experience in similar work and shall provide to the Owner on the Minimum Qualifications Form a list of five (5) contracts of similar size, scope, and complexity to this Project completed or substantially completed within the last ten (10) years.

Contract Security, EEO/AA Insurance, NY State Vendor Responsibility Questionnaire (Executive Order 125). See Contract Documents for details.

SDVOB Goal: 1.00%. MBE Goal: 2.00%. WBE Goal: 2.00%.

Similar open bids

In New York

More from Dormitory Authority of the State of New York

Open bids