State University Construction Fund (New York) posted this IFB on Oct 13, 2026. Responses are due Nov 10, 2026. Category: Construction - Building. Solicitation number 2139822.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The work of this single bid project includes the reconstruction of an existing academic and research facility through a phased gut renovation that includes new floor plan layouts, hazardous material abatement, replacement of mechanical, electrical, plumbing, and fire protection systems, laboratory and support space upgrades, window replacement, elevator modernization, and building envelope improvements to enhance energy performance, accessibility, and code compliance.
The work of this single bid project includes the reconstruction of an existing academic and research facility through a phased gut renovation that includes new floor plan layouts, hazardous material abatement, replacement of mechanical, electrical, plumbing, and fire protection systems, laboratory and support space upgrades, window replacement, elevator modernization, and building envelope improvements to enhance energy performance, accessibility, and code compliance.
A Project Labor Agreement (PLA) has been adopted for this project. This agreement openly promotes bidding from all contractors – union and non-union. The low bidder must execute and abide by the terms of the project-specific Project Labor Agreement. This Project Labor Agreement also impacts acceptable staffing patterns for the project. The PLA should be read in its entirety by all potential bidders prior to submitting a Proposal.
Plans will be available after October 13, 2026, through Dataflow, Inc. (518-463-2192 & https://www.nyplanroom.com/).
Principal subcontractors must be named within 48hrs after the bid opening per the Information for Bidders Section 8.
Bidders must submit within 48hrs either the certification of its NYS VendRep questionnaire (preferred), or if not enrolled in VendRep a signed and notarized paper CCA2 form (Version 3/22 only), Attachments A, B, and C, Appendix A form, and work descriptions.