Appalachian State University (North Carolina) posted this RFP on Nov 20, 2026. Responses are due Dec 11, 2026. Category: Construction - Building. Solicitation number 68-20090-DB.
Kidd Brewer Stadium East Side Lower Bowl Replacement (Solicitation for Design-Build Services)
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The existing East Side lower bowl section of Kidd Brewer Stadium is now more than 60 years old and no longer meets modern safety, accessibility and operational standards. The existing lower bowl seating section is in very poor condition requiring full replacement. This project was authorized for advance planning in September 2025, and a copy of the final advance planning report will be sent to interested contractors upon request.
Project Budget: **$10,000,000**
Scope of work includes full demolition and construction of new seating area with new concrete/bleachers that will be closer to the field with a wider concourse. Additional ADA seating and wider aisles between rows will result in a loss of approximately 205 seats. The loss of seats should be offset by expanding the seating section toward the SE corner of the stadium. The project would need to also include premium loge boxes/seating along the top of this new seating section.
Submit To
Appalachian State University, 2458 Hwy 105, Boone, NC 28607, Attn: James Perry
In order to offer architectural or engineering services in response to this solicitation, the designer on the team responding must be licensed in the State of North Carolina.
Additional information about this project: https://facilities.appstate.edu/planning-design-construction/requests-proposals
Subscribe to get this document.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.