City of Charlotte (North Carolina) posted this RFQu on Nov 16, 2026. Responses are due Dec 17, 2026. Category: Architecture & Engineering. Questions are due 2026-12-10 17:00. Solicitation number FY27-RFQ-05.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Charlotte Water (CLTWater) is soliciting Statements of Qualifications (SOQ) from qualified engineering companies (Company or Proposer) to provide design services for the Bryant Farms Phase 3 Water Transmission Main (Project).
The southern portion of the 882 Zone has limited water main transmission capacity. Customers in the Waverly area experience diurnal pressure fluctuations that exceed and minimum pressures that fall below the established "Minimum Acceptable Performance" and/or "Level of Service" criteria. This project would increase transmission capacity in the southern portion of the 882 Zone, helping to reduce diurnal pressure fluctuations and improve minimum pressure during peak-day demand conditions in the Waverly area, thereby meeting the established "Minimum Acceptable Performance" and/or "Level of Service" criteria.
The project will include approximately 9,400 feet of new 36” water transmission main from the existing water main running along Bryant Farms Road at Elm St to the existing water main on Johnston Rd. Design of the 36” water main will include test stations and a corrosion assessment of the proposed alignment to determine cathodic protection needs.
The Design Build Teams’ scope of work will include, but not be limited to:
The Designer shall propose a qualified, local team to provide real estate services to acquire permanent and temporary easements and provide any relocation services necessary to complete the construction proposed by the Designer.
The Designer shall be responsible for surveying, SUE, real estate, utility coordination and relocation, environmental studies, and permitting.
Utility Coordination will be needed to identify existing public and private utilities that need to be adjusted or relocated within the project limits for all design aspects of the project, including roadway, drainage, signals, and water main.
Proposals must be submitted electronically through the Procurement Portal no later than **December 17, 2026 at 2:00 p.m.** Companies wanting to be considered for providing the required services for the City must submit all required documents and respond to all questions with the Procurement Portal under the respective Project.
Due to demands on the time of the Selection Committee members, please limit your proposal to twenty (20) pages.
Pursuant to North Carolina General Statute 143-64.31, Charlotte Water is conducting a “qualifications-based” selection process without regard to fee.
Evaluation criteria
The Company is required to submit the *CBI Form 3* attached in Exhibit 1. Failure to submit this form with the Proposal shall render the Proposal non- responsive.
The selected firm will be required to provide certificates of insurance and copies of their insurance policies evidencing coverage for professional liability in the minimum amount of **$1,000,000**; automobile liability in the minimum amount of **$1,000,000**; commercial general liability in the minimum amount of **$1,000,000**; and workers’ compensation insurance as required by North Carolina statutes.
Subscribe to get these 6 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.