RFQ 2027-018 Stormwater Design Manual

Active 377-RFQ 2027-018 RFQuArchitecture & EngineeringCOUNTY OF UNION
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

COUNTY OF UNION (North Carolina) posted this RFQu on Nov 16, 2026. Responses are due Dec 16, 2026. Category: Architecture & Engineering. Questions are due 2026-12-02 17:00. Solicitation number 377-RFQ 2027-018.

Solicitation details

General information

Solicitation number
377-RFQ 2027-018
Notice type
RFQu
Place of performance
North Carolina
Questions due
2026-12-02 17:00

Agency and category

Agency
COUNTY OF UNION
Category
007Architecture & Engineering
Source listing
Link with a plan

Description

From the agency listing

Union County, North Carolina, through the Union County Planning Department, is seeking Statements of Qualifications (SOQs) from qualified professional engineering and consulting firms to develop the Union County Stormwater Design Manual.

The selected firm will provide stormwater technical standards, design criteria, stormwater control measure guidance, administrative procedures, public outreach, and final manual deliverables.

This is a Request for Qualifications (RFQ). Responding firms shall not include project-specific work product or fee proposals in their SOQ. Selection will be conducted in accordance with N.C.G.S. § 143-64.31.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Union County, North Carolina, through the Union County Planning Department, is seeking Statements of Qualifications (SOQs) from qualified professional engineering and consulting firms to develop the Union County Stormwater Design Manual. The selected firm will provide stormwater technical standards, design criteria, stormwater control measure guidance, administrative procedures, public outreach, and final manual deliverables.

The manual will establish consistent stormwater design standards, accepted engineering methodologies, stormwater control measure guidance, and review and submittal procedures. The estimated total project budget is **$150,000**, inclusive of both the Base Scope of Services and any optional Additional Services authorized by the County.

This is a Request for Qualifications (RFQ). Responding firms shall not include project-specific work product or fee proposals in their SOQ. Selection will be conducted in accordance with N.C.G.S. § 143-64.31.

Scope

The selected consultant shall provide all labor, materials, and professional expertise necessary to develop a standalone Union County Stormwater Design Manual addressing the tasks and deliverables described below. [...] The scope includes data collection, development of technical engineering criteria, a library of stormwater control measures, administrative and submission procedures, and public outreach and training.

Task 1: Project Kick-off & Data Collection

- Kick-off Meeting: Convene with Planning leadership and the Stormwater team to refine the project timeline, review project goals, and establish communication protocols.

Task 2: Technical Design Criteria

- Hydrology: Determine design storm intensities and return periods (2-, 10-, 25-, 50-, and 100-year storms), approved calculation methodologies (including Rational Method and TR-55 as appropriate), acceptable software, and design approaches.

Task 3: Stormwater Control Measure (SCM) Library

Develop a menu of approved SCM designs. For each SCM, provide:

  • Example design schematics and typical cross-sections.
  • Siting constraints, including soil type and depth to groundwater.
  • Maintenance requirements and lifecycle cost estimates.

Task 5: Public Outreach & Training

- Workshops: Conduct at least two public workshops, one for the development community/engineers and one for County staff.

Project Timeline & Deliverables

The consultant shall provide monthly project status reports and the following deliverables, measured from issuance of the Notice to Proceed:

1. Project Work Plan & Schedule — within 15 days of Notice to Proceed.
2. Annotated Outline — proposed table of contents for the manual, within 60 days of Notice to Proceed.
3. Technical Memorandum — summary of Task 1 findings, within 90 days of Notice to Proceed.
4. 50% Draft Manual — focusing on Task 2 criteria, within 180 days of Notice to Proceed.
5. 90% Draft Manual — complete draft including checklists and appendices, within 270 days of Notice to Proceed.
6. Final Manual — digital PDF and editable Word/InDesign versions and physical copies, including a standard detail CAD (.dwg) library, within 365 days of Notice to Proceed.

Additional information

The SOQ must be submitted electronically by using the following link: Union County Submittal Portal. [...] Complete the form, upload the SOQ as one complete document and select submit. The maximum size accepted is 20 MB. [...] Paper submissions will not be accepted.

All submittals are to be received no later than **11:00 AM EST on December 16, 2026**. Any submittals received after this date and time shall be rejected without exception.

The submittal must be signed by a person who is authorized to bind the proposing Company. The total length of the submittal, including cover letter, should be no more than 50 single-sided pages. [...] Receipt of Addenda shall be acknowledged by the Offeror on *Appendix B, Addendum and Anti-Collusion* form.

In accordance with the North Carolina Mini-Brooks Act (NCGS §143-64.31), firms will be evaluated and ranked based on demonstrated competence and qualifications for the type of professional services required, without regard to fee. [...] Price information shall not be submitted with the Statement of Qualifications and will not be considered during the evaluation process.

The County will enter into negotiations with the best qualified firm to establish a fair and reasonable fee for the required services. [...] The County intends to select one (1) qualified professional engineering firm through this solicitation.

All communications [...] must be made only through the Procurement Contact noted on the cover of this RFQ.

Documents

1 file

Subscribe to get this document.

Similar open bids

In North Carolina

More from COUNTY OF UNION

Open bids