Town of Morehead City (North Carolina) posted this RFQu on Nov 13, 2026. Responses are due Dec 18, 2026. Category: Architecture & Engineering. Questions are due 2026-12-04 10:00. Solicitation number 675RFQ LS2027-001.
Morehead City, North Carolina (the “City”), is seeking Statements of Qualifications (“SOQs”) from qualified firms to provide Engineering Services for West End Sewer Capacity Increase – Phase II. Phase I planning is underway, which increases capacity at four existing lift stations and related infrastructure with the upgrades of existing pumps and motors and additional force main construction. Phase II is for the planning, design, and construction of an additional lift station, with the intention of further mitigating head pressure on existing facilities. Morehead City has acquired property for the construction of this lift station at 4800 Country Club Rd Morehead City, NC.
The intended result of the West End Sewer Capacity Increase – Phase II Project is the addition of a lift station to the current City wastewater system, located at 4800 Country Club Rd, Morehead City, NC. The selected firm shall identify and present a recommendation for a lift station design that incorporates technology and equipment in line with Morehead City standard specifications and details and integration with the existing system. The selected firm will provide general project management and construction oversight in addition to the professional services to support the project through construction and project completion.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Morehead City, North Carolina (the “City”), is seeking Statements of Qualifications (“SOQs”) from qualified firms to provide Engineering Services for West End Sewer Capacity Increase – Phase II. Phase I planning is underway, which increases capacity at four existing lift stations and related infrastructure with the upgrades of existing pumps and motors and additional force main construction. Phase II is for the planning, design, and construction of an additional lift station, with the intention of further mitigating head pressure on existing facilities. Morehead City has acquired property for the construction of this lift station at 4800 Country Club Rd Morehead City, NC.
The intended result of the West End Sewer Capacity Increase – Phase II Project is the addition of a lift station to the current City wastewater system, located at 4800 Country Club Rd, Morehead City, NC. The selected firm shall identify and present a recommendation for a lift station design that incorporates technology and equipment in line with Morehead City standard specifications and details and integration with the existing system. The selected firm will provide general project management and construction oversight in addition to the professional services to support the project through construction and project completion.
Project services to include but not limited to
1. Project Planning
2. Existing-Condition Evaluation
3. Preliminary and Final Design
4. Permitting Support
5. Bidding and Negotiation Assistance
6. Construction Administration
7. Project Closeout
Submission
Firms should submit **one printed, bound paper copy and one digital copy of the submittal provided on a USB flash drive**. The submittals will not be read aloud at that time. Submittals are to be clearly labeled “Response RFQ LS2027-001 - Engineering Services” on the outer envelope and mailed or physically delivered to Morehead City Hall, Attn: Sarah Currie, 1100 Bridges St, Morehead City, NC 28557.
Responding firms and proposed subconsultants shall be legally authorized to do business in North Carolina and hold all applicable North Carolina professional registrations, licenses, certifications, and permits required for the project. **Required** forms: *Exhibit A* and Acknowledged Addenda, if applicable.
Evaluation
Firms will be evaluated through the qualifications-based selections (QBS) process. Firms are selected based on demonstrated competence and qualifications for the type of services required, without regard to fee other than unit price information.
| Percent | Component |
| --- | --- |
| 35 | Relevant Firm Profile and Experience |
| 30 | Project Team Profile |
| 20 | References |
| 15 | Project Approach |
Insurance and contract
See *Exhibit E* for Morehead City’s insurance requirements. Adequate insurance coverage is to be maintained for the duration of the contract period.
Anticipated Contract Negotiation: January 2027.
Subscribe to get this document.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.