City of Charlotte (North Carolina) posted this ITB on Nov 9, 2026. Responses are due Dec 8, 2026. Category: Construction - Building. Questions are due At least seven (7) calendar days before the Bid Due Date. Solicitation number 269-2027-043.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Charlotte (hereinafter the “City”) will receive sealed bids for the following Project: Mint Museum Randolph Roof Repair Project - Phase ii, Project Number 269-2027-043.
The estimated cost of this Project is $0 - $2,000,000.
The Mint Museum Randolph Roof Repair Project – Phase 2 shall include removal of existing roofing down to the roof deck and installation of new single-ply roofing, together with all associated miscellaneous work indicated in the drawings and specifications. Bid alternates include installation of metal wall panels above roof level as shown on the drawings.
**Project Location:** Mint Museum Randolph – 2730 Randolph Road Charlotte, NC 28207
Submission
For this project, bids must be submitted **electronically through the Procurement Portal** (https://charlottenc.bonfirehub.com). Bidding documents are available for free from the Procurement Portal.
**Bid Due:** December 8, 2026 before 1:00 PM (Local Time).
Bidders must be properly licensed under North Carolina state law to perform the work.
A **5% bid security** is required with each bid that equals or exceeds **$300,000**.
An EMR of .9 or less, averaged over the past three (3) full years, is **required** to be considered for award of this project. A letter, on Insurance Carrier’s letterhead, documenting EMR Factor rating is required at time of Bid and must be included in the Bid Submission.
The pre-bid meeting and site visit are not mandatory, but attendance is strongly advised.
The undersigned agrees to complete the work within 120 calendar days from the Notice to Proceed. Liquidated Damages of $500 per calendar day are hereby agreed upon as assessment from the Contractor for failure to complete the work within the time period stated herein.
CBI Goal: SBE = 0%