City of Columbus (Ohio) posted this RFSQ on Nov 17, 2026. Responses are due Dec 8, 2026. Category: Construction - Building. Questions are due 2026-12-02 14:00. Solicitation number RFQ034113.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The City of Columbus seeks a qualified firm to provide a comprehensive solution that includes assisting in design-development and construction management services of a new facility which will include the City of Columbus Refuse station with a maintenance garage and office (20,000 SF), SWACO Transfer Station Building (25,000 SF), SWACO Office (3,000 SF), SWACO Administration Building, SWACO Scale and Scale House, COC maintenance building/office, renovated the current garage/office building into a convenance center. The site is located at 1550 Georgesville Road, Columbus, Ohio 43207. The site area is 9 acres.
This Project will be constructed under a Construction Manager at Risk (CMaR) delivery method. The selected CMaR will work with the City of Columbus (Owner), and the Architect-of-Record (A/R), who are under separate contract with the City (Owner), to develop construction documents which may lead to several Guaranteed Maximum Price (GMP) amendments provided by the CMaR after completion of design and competitive bidding by the selected CMaR.
The scope of the work shall include completed construction services including review of design documents for budget, schedule and constructability and construction of the facility and construction management services. The collaboration with the design team shall include (but not limited to) services related to site plan review and approval, and complete construction-design services for any required improvements in the right-of-way. Construction review services shall include a focus on integrated, high-performance sustainable design. Coordinate low voltage systems design, audio/ video, and furniture, fixtures, and equipment (FFE) design.
The CMaR will be responsible for full construction services for the Project, which includes, but is not limited to, the following: design submittal review and preconstruction services, participation in developing the construction budget and updated construction cost estimates, participation in preparing the construction schedule (including identification of significant Project milestones for completion of the Work), prequalification of subcontractors to perform the required Work, regular reporting and management of construction, cost, schedule, and close-out phases of the Project.
Pre-Construction Services
Construction Services
Post Construction Services
RFSQ Submittals will be received electronically by the City until **December 8th 2026 @ 2:00 PM local time**. Submittals received after this date and time shall be rejected by the City. Submit through **Bonfire**.
Submittals shall be made as a compressed, secure, PDF document. The file is NOT to be password protected. Password protected submittals will be deemed non-responsive.
Submittal may not exceed one hundred (100) letter-sized (8.5" x 11") pages of information (e.g. text, graphics, etc.), and shall include the information specified in Section 4. The submittal shall include the *SOQ/Proposal Signature Form* as the front page and shall be signed by a person authorized to obligate the CMaR firm(s). Failure to include this Form shall render the SOQ submittal nonresponsive.
Do not submit a fee proposal with your response to this RFSQ. A "best-value" fee proposal shall be requested from short-listed CMaR firms.
The CMaR must have a Contract Compliance number from the City of Columbus Office of Diversity and Inclusion. Contract compliance numbers must be obtained prior to the RFSQ response deadline and shall be included in the SOQ submittal.
A bidder that refuses to agree to become a signatory to the CBA shall be deemed non-responsive.
The CMaR to whom an award is made will be required to execute a written contract with the City of Columbus, Ohio within ten (10) business days after receiving such contract for execution.
It is DoFM's intent to have all construction necessary for the daily operations for the facility substantially complete by September 1st, 2029.
Subscribe to get these 4 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.