Turbo Blower No. 6

Active 27-3222 ITBConstruction - Heavy & CivilCity of Bend
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

City of Bend (Oregon) posted this ITB on Oct 16, 2026. Responses are due Nov 17, 2026. Category: Construction - Heavy & Civil. Questions are due Not less than 10 days prior to Closing. Solicitation number 27-3222.

Solicitation details

General information

Solicitation number
27-3222
Notice type
ITB
Place of performance
Oregon
Questions due
Not less than 10 days prior to Closing

Agency and category

Agency
City of Bend
Category
006Construction - Heavy & Civil
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The City of Bend invites Sealed Bids for the Turbo Blower No. 6 Project, Project No. 1SW01. The project consists of furnishing, installing, and commissioning a sixth 400-horsepower dual-core APG-Neuros turbo blower in Blower Building 32B at the Bend Water Reclamation Facility. The building was originally constructed with space reserved for a sixth turbo blower as part of a planned future expansion.

The installation of a sixth turbo blower will utilize the space originally reserved for future expansion and will provide additional aeration capacity and operational redundancy to support current and projected treatment needs.

Bend City Council approved an exemption to expressly specify and require the Contractor to procure and supply an APG-Neuros brand turbo blower for this Project on October 7, 2026, pursuant to Oregon Revised Statutes 279C.345.

The Engineer's estimate is **$914,000 to $1,059,000**.

Scope

Work associated with this installation includes relocating the adjacent air handling tank and associated piping and utilities, as necessary, to provide adequate space, access, and operational clearances for the new equipment. Structural improvements include the design and construction of a reinforced concrete equipment pad to support the turbo blower and accommodate operational and maintenance loads.

Mechanical work includes installation of all process piping, supports, fittings, valves, and appurtenances required to integrate the new turbo blower into the existing aeration system. Electrical work includes all required electrical studies, power distribution equipment, conduit, wiring, disconnects, grounding, and control wiring necessary for a complete and operational installation.

The Contractor shall furnish and install all field wiring and communications infrastructure required for blower monitoring and control. Programming, PLC integration, SCADA modifications, and associated control system configuration will be performed by the City.

The Project also includes all associated modifications, testing, startup, and commissioning activities necessary to deliver a complete, fully functional, and reliable blower installation. The Contractor shall coordinate with the City and the turbo blower manufacturer during startup and commissioning to verify proper operation of all equipment, controls, and communication interfaces. Final commissioning and performance verification shall be performed by the turbo blower manufacturer's authorized representative to confirm compliance with the specified performance requirements.

The project is located at the City's Water Reclamation Facility (WRF), 22395 McGrath Road, Bend, OR, 97701.

Additional information

Submission:** One copy shall be submitted in electronic form through the City of Bend's eProcurement Portal at https://bendoregon.bonfirehub.com. Bids received after Closing will not be given further consideration. **Bids are due November 17, 2026, at 2:00 PM.

**Bid Bond:** A bid bond, irrevocable letter of credit, cashier's check or certified check in the amount of **five percent** of the total amount of the Bid must be uploaded to the Portal.

**Payment and Performance Bonds:** In the amount of **100 percent** of the Contract, required at the time of contracting.

**First-Tier Subcontractor Disclosure:** Bidders must submit a First Tier Subcontractor Disclosure Form (Exhibit D) within two working hours of the deadline for Bid submittal if Bid totals $100,000 or greater.

**Award:** The Contract will be awarded to the lowest responsible bidder(s). The Bid must be kept open for 90 days after Bid submission.

**Required Qualifications:** Bidders must be licensed with the Construction Contractors Board with the proper endorsement type for the work prior to Bid submittal, and must have a current Public Works Bond meeting the requirements of ORS 279C.836.

**Completion:** Work on the Project is to be completed by December 1, 2027.

Documents

11 files

Sign up free to get these 11 documents.

  • Determination for APG-NEUROS Turbo Blower Brand Name Exemption.pdf
    Download
  • Exhibit E - General Conditions.pdf
    Download
  • Exhibit F - Technical Specifications.pdf
    Download
  • Exhibit G - Drawings.pdf
    Download
  • ITB EXHIBIT B-2 Bid Submittal Responsive Form.pdf
    Download
  • ITB EXHIBIT B-3 Bid Bond Form.pdf
    Download
  • ITB EXHIBIT B-4 Addenda Certification Form.pdf
    Download
  • ITB EXHIBIT B-5 Statement of Assurances Certifications Form.pdf
    Download
  • ITB EXHIBIT B-6 Offsite Prevailing Wage Acknowledgement.pdf
    Download
  • ITB EXHIBIT D First-Tier Subcontractor Disclosure Form.pdf
    Download
  • Turbo Blower No. 6 ITB 27-3222.pdf
    Download

Similar open bids

In Oregon

More from City of Bend

Open bids