Tualatin Valley Water District (Oregon) posted this IFB on Oct 28, 2026. Responses are due Nov 19, 2026. Category: Construction - Heavy & Civil. Solicitation number S-R34750-00018286.
Tualatin Valley Water District is seeking bids for the 176th and Sugar Plum Water Main Replacement Project C12946, located in Washington County, Oregon.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
Sealed bids for the construction of the 176th & Sugar Plum Main Replacement, Project No. C12946 (Project) for Tualatin Valley Water District (Owner) will be accepted electronically at https://bidlocker.us/details/6398_176Th_Sugar_Plum_Main_Replacement_Itb (Bid Locker), until 2:00 p.m. local time on November 19, 2026 (Bid Closing Time).
The Project consists of furnishing required labor, equipment, and materials for construction of the following:
The replacement of approximately 5,290 linear feet of 4- and 6-inch cast iron water main with 4- and 8-inch ductile iron pipe, and 140 linear feet of 12-inch HDPE horizontal directional drill, including all services, hydrants, appurtenances, and fittings as shown on the plans.
The Engineer's estimate for this Project is **$2,275,000**.
The Project consists of furnishing required labor, equipment, and materials for construction of the following:
The replacement of approximately 5,290 linear feet of 4- and 6-inch cast iron water main with 4- and 8-inch ductile iron pipe, and 140 linear feet of 12-inch HDPE horizontal directional drill, including all services, hydrants, appurtenances, and fittings as shown on the plans. The Project includes abandonment of existing main, surface restoration, traffic control, and erosion control in the vicinity of SW 176th Ave and SW Sugar Plum Ln in Washington County, OR.
All work is to be completed by June 30, 2027 according to the schedule provided in the Contract documents. District intends to issue Notice to Proceed date no later than January 11, 2027.
**Submission method:** Sealed bids will be accepted electronically at Bid Locker. Bidders must sign up with Bid Locker at https://bidlocker.us/a/tvwd/BidLocker before being allowed to submit a bid. There is no cost to register. Any bids received after the Bid Closing Time will not be considered.
Bidders are required to submit a *First Tier Subcontractor Disclosure Form* (First Tiers), as described by ORS 279C.370. The First Tiers must be submitted to Bid Locker within two hours of the Bid Closing Time. Bidders are required to complete and submit Section 00 45 13, "Statement of Bidder's Qualifications" with their bid.
Bids must be submitted on the prescribed forms and must be accompanied by a certified check or bid bond executed in favor of Tualatin Valley Water District in an amount equal to five (5) percent of the amount bid as described in Paragraph 11.1 of Section 00 21 13 Instructions to Bidders. The successful Bidder will be required to furnish the necessary additional bond(s) for the faithful performance of the Contract as prescribed in the Contract Documents.
The Owner reserves the right to waive informalities and to award a Contract to the qualified lowest responsive and responsible Bidder.
Sign up free to get this document.