Montgomery County (Pennsylvania) posted this ITB on Nov 18, 2026. Responses are due Dec 17, 2026. Category: Construction - Heavy & Civil. Solicitation number 6623.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
This project involves the repair, replacement, upgrade or new installation of guide rail at Montgomery County bridges and roadways as necessary. This is a 2-year contract, and the work is on-call as authorized by the county representative not to exceed **$150,000**. Locations and scope of work will be provided to the contractor as they are identified by the County.
Work shall be performed on an as-needed basis, as authorized by Montgomery County through written authorization. Actual quantities may vary from the estimated bid quantities, and the County reserves the right to increase, decrease, or eliminate individual bid items based upon actual maintenance needs, subject to the Contract Documents.
The successful bidder shall be responsible for supplying all material and equipment for the completion of the work described.
All materials workmanship and construction methods must meet the requirements of the Commonwealth of Pennsylvania Department of Transportation (PennDOT) Publication 408 Specifications, latest edition.
Traffic control including but not limited to: barricades, signs, flagmen, etc., shall be supplied and maintained by the successful bidder in accordance with the PennDOT Publication 213, Temporary Traffic Control Guidelines, latest edition.
The Contractor shall at his own expense, sustain in their places and protect from direct or indirect injury, all utilities, pipes, conduits, poles, tracks, walls, buildings, and other structures or property in the vicinity of his work, whether above or below ground.
Contractor shall obtain and pay for any and all permits required by Federal, State or local governments or utilities.
Work not specifically itemized, but required to complete the intended project, shall be considered incidental to the project.
The successful contractor shall be responsible for the removal and proper disposal of, at his expense, all refuse associated with this specification.
All work shall be guaranteed by Contractor against defects in workmanship and materials for a period of one (1) year from the date of acceptance by the County.
This work consists of furnishing all labor, equipment, materials, hardware, and incidentals necessary to remove and dispose of existing timber guide rail components where indicated and to furnish and install new timber guide rail, posts, hardware, transitions, and connections in accordance with the contract documents and these specifications.
Upon receipt of authorization, begin, continue and complete all work by the time periods defined below.
Bidders are required to submit their pricing and all documentation through the Bonfire Website. A copy of the Bid Bond, Appendix A, *Responsible Contractor Certification Form*, a Current W-9, and copies of all other requested documentation should be uploaded as separate documents.
Responses to this RFP must be submitted through the County’s procurement submission portal, Bonfire, at https://montcopa.bonfirehub.com/portal. All questions must be submitted through the Bonfire portal, and answers will be posted there for public review.
This Contract shall be for a period of two (2) years from the date established in the Notice to Proceed, unless otherwise specified in the Contract Documents.
A contract may be awarded to the lowest responsible bidder, meeting all the requirements of the specifications on the basis of the lowest total price.
Bidders on this project must be PennDOT pre-qualified in the applicable work class codes to qualify for consideration on this project and must be able to provide one trained guide rail installer at each location.
A performance bond in the amount of One Hundred Percent (100%) of the contract sum [...] shall be submitted. A payment bond in the amount of One Hundred Percent (100%) of the contract sum shall be submitted.
A separate Maintenance bond in an amount equal to 100% of the total contract shall be furnished prior to final payment [...].
The successful bidder shall be required to carry liability insurance as described below: [...] $1,000,000 Each Occurrence [...] $2,000,000 General Aggregate [...].
Successful bidder(s) shall abide by the Prevailing Wages as it applies to this project.