Beaufort-Jasper Water and Sewer Authority (South Carolina) posted this RFP on Nov 18, 2026. Responses are due Dec 21, 2026. Category: Architecture & Engineering. Questions are due 2026-12-07 16:30. Solicitation number 2027-RFP-014.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
BJWSA is soliciting proposals from qualified engineering firms to perform a comprehensive condition assessment of the sanitary sewer collection system infrastructure conveying pressurized sewer flow from CP67 and CP87 to downstream transition points in the sewer system. The assessment will consist of ≈12,700 linear feet on 18” DIP force main and 81,500 linear feet of 16” DIP force main.
A detailed Scope of Work/Services is provided in *Exhibit G*.
All work must be completed by **May 17, 2027** and billed by **June 14, 2027**. All invoices must be emailed to invoices@bjwsa.org.
Each mainline below must be priced separately in your Fee Proposal:
Submission method
SUBMITTALS FOR THIS PROJECT WILL BE ACCEPTED ONLY ON THE BONFIRE PROCUREMENT PLATFORM PRIOR TO THE PROPOSAL DUE DATE/TIME. Each proposal must be submitted electronically via the BJWSA Procurement Portal and include all required documents and information. Responses received after the deadline or at any other location will not be accepted.
Proposals are limited to a maximum of 50 standard 8.5” by 11” pages, excluding cover page and section dividers. Fee Proposals shall be submitted as a separate electronic file. No pricing information shall be included within the main proposal document. All Proposal fees and pricing shall be valid and honored for a period of at least ninety (90) days from the Submittal Deadline.
BJWSA requires that all issued addenda be acknowledged by the Contractor by completing and submitting *Exhibit C* to be considered responsive. Each Contractor shall submit a completed and signed *Contractor Illegal Immigration Compliance Affidavit* and a completed and signed *Vendor Artificial Intelligence (AI) Use Attestation*.
Respondents must complete BJWSA’s Good Faith Effort packet for Small, Minority and Women-Owned Business (SMWBE) Participation. The deadline for the Good Faith Effort Written Notice Requirement is 12/6/2026.
Evaluation criteria
Insurance
Additional Insured coverage must be maintained for a period of eight (8) years from the date of the Certificate of Substantial Completion or the Certificate of Occupancy, whichever is dated later.