27CMR027 - Multiple Construction Manager-at-Risk (CMAR) for Austin High School, Delco Activity Center, Nelson Field, and Nelson Bus Terminal

Active 27CMR027 RFQuConstruction - BuildingAustin Independent School District
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

Austin Independent School District (Texas) posted this RFQu on Oct 16, 2026. Responses are due Nov 10, 2026. Category: Construction - Building. Questions are due 2026-10-30 15:00. Solicitation number 27CMR027.

Solicitation details

General information

Solicitation number
27CMR027
Notice type
RFQu
Place of performance
Texas
Questions due
2026-10-30 15:00

Agency and category

Agency
Austin Independent School District
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Austin Independent School District (“AISD”) requests Statements of Qualifications (SOQ) as Step 1 in a two-step process to select Multiple Construction Manager-at-Risk (CMAR) to provide construction services for modernization and facility improvements at Austin High School, Nelson Field, Nelson Bus Terminal, and Delco Activity Center. These four projects are part of the AISD’s 2022 Bond Program, and are being solicited as a single project with multiple sites.

Scope

The combined scope includes building additions, renovations, structural and building system repairs, utility upgrades, and associated site improvements. Work will require coordination with ongoing school, transportation, athletic, and facility operations, including construction phasing and temporary closures where necessary. [...] Project-specific scopes, estimated construction budgets, and anticipated schedules are provided as separate items in the attached project descriptions.

Refer to Scope of Work Project Prospectus provided as Attachment A.

Additional information

**Submission method:** Submit Proposals via Bonfire, https://austinisd.bonfirehub.com/portal/ by **2:00 PM CST on NOVEMBER 10, 2026**. LATE SUBMISSIONS WILL NOT BE ACCEPTED.

All Questions pertaining to this CMAR must be submitted through the AISD Bonfire Portal no later than **OCTOBER 30, 2026 by 3:00 PM CST**. Q & A and all Addenda will be posted on the AISD Bonfire Portal.

Up to five (5) finalist firms for each Bid Package will be notified in writing and will then proceed to Step 2. The top ranked Respondent(s) following Step 2 will proceed to contract negotiations.

Step 1 scoring (100 points total)

  • 50 Points: Relevant Qualifications, Experience and Past Performance
  • 30 Points: Proposed Personnel/Methodology
  • 10 Points: Firm History and Stability
  • 10 Points: Safety Record

No pricing should be submitted, nor will it be considered as part of Step 1.

**Period of Performance:** The term of a contract awarded under this RQP will begin upon execution of A Construction Manager-at-Risk contract and will continue until all project obligations under the Construction Manager-at-Risk contract are completed, including the warranty phase services.