Hal C. Weaver Power Plant Turbine Replacement

Active RFP-CMR1603-270001-Bonfire RFPConstruction - BuildingUniversity of Texas at Austin
The full text, documents and contacts of this bid open with a free account.Sign up free to read it

At a glance

University of Texas at Austin (Texas) posted this RFP on Oct 30, 2026. Responses are due Dec 3, 2026. Category: Construction - Building. Solicitation number RFP-CMR1603-270001.

Solicitation details

General information

Solicitation number
RFP-CMR1603-270001-Bonfire
Notice type
RFP
Place of performance
Texas

Agency and category

Agency
University of Texas at Austin
Category
005Construction - Building
Source listing
Link after sign-up

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - sign up free to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The University of Texas at Austin (Owner) is soliciting proposals (Proposals) for the selection of a Construction Manager-at-Risk for Capital Planning and Construction Project No. 102-1603 –Hal C. Weaver Power Plant Turbine Replacement (Project), in accordance with the terms, conditions, and requirements set forth in this Request for Proposals (RFP).

Scope

The Owner's objective is an injury and incident-free Project, with a focus on project safety that shall not be compromised to achieve any other business objective. The Contractor shall structure an effective and systematic safety management approach that emphasizes continuous improvement.

The Contractor shall bear overall responsibility for all aspects of safety for the Project.

  • The Contractor must provide a qualified Project Safety Coordinator (PSC). The PSC is required from the commencement of construction until at least such time the Owner's Designated Representative (ODR) issues notice of Substantial Completion.
  • Project Safety Assistant(s) (PSA(s)) are also required. Number of and placement on the project is determined by the final contracted construction amount and average daily work force.
  • Each tiered Subcontractor shall declare one (1) or more employees to be its designated SSR.
  • The Contractor shall develop, implement, and furnish adequate resources for their PSMP.
  • The Contractor shall submit a complete draft of the PSMP to the ODR for review and written acceptance prior to the issuance of NTP for construction services.
  • The Contractor shall purchase and maintain at least one (1) First Aid Kit on the Project site as per ANSI Z308.1.
  • The Contractor shall purchase and maintain at least one Automatic External Defibrillator (AED) unit on the Project site.
  • The Contractor shall post a pair of safety regulation signs at every point of entry to the Project: one in English and one in Spanish.
  • The Contractor shall create and maintain files for Owner review.

Additional information

The qualifications and previous work experience of the proposed Project Safety Coordinator and Project Safety Assistant(s) shall be submitted with the RFP.

Prior to Notice to Proceed for Construction Services, the Contractor must provide resumes for the proposed PSC and PSAs.

Documents

18 files

Sign up free to get these 18 documents.

  • 00 RFP-CMR1603-270001 Hal C. Weaver PPL Turbine Replacement.pdf
    Download
  • 01 RFP-CMR1603-270001 SAMPLE Draft Agreement.pdf
    Download
  • 02 Exhibit H Subcontracting Plan.pdf
    Download
  • 03 Certificate of Interested Parties.pdf
    Download
  • 05 Uniform General Conditions.pdf
    Download
  • 06 00 73 16 Project Insurance Full 20230501.pdf
    Download
  • 06 01 31 00 Project Administration Requirements - CIP.pdf
    Download
  • 06 01 32 00 Construction Progress Documentation.pdf
    Download
  • 06 01 35 23 Project Safety Requirements - CIP.pdf
    Download
  • 06 01 45 00 Project Quality Control.pdf
    Download
  • 06 01 57 23 Temporary Storm Water Pollution Control.pdf
    Download
  • 06 01 77 00 Project CloseoutProcedures.pdf
    Download
  • 06 01 91 00 General Commissioning Requirements.pdf
    Download
  • 06 10 14 16 11 Building Plaque.pdf
    Download
  • 07 Attachment A Prevailing Wage Rate Determination.pdf
    Download
  • 07 OwnersSpecialConditions with Attachments.pdf
    Download
  • 08 UT Austin Design and Construction Standards Website.pdf
    Download
  • 09 ADDENDA ACKNOWLEDGEMENT.pdf
    Download

Similar open bids

In Texas

More from University of Texas at Austin

Open bids