RFQ #26-020: Low Voltage Upgrade Design at SO Campus

Active RFQ #26-020 RFQArchitecture & EngineeringTarrant County College District
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Tarrant County College District (Texas) posted this RFQ on Nov 12, 2026. Responses are due Jan 5, 2027. Category: Architecture & Engineering. Solicitation number RFQ #26-020.

Solicitation details

General information

Solicitation number
RFQ #26-020
Notice type
RFQ
Place of performance
Texas

Agency and category

Agency
Tarrant County College District
Category
007Architecture & Engineering
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Tarrant County College District (TCCD) seeks a qualified engineering firm to provide professional engineering and related design services for the assessment, design, and construction administration of improvements to the South Campus low-voltage electrical distribution infrastructure, operating at 480V and below. South Campus is located at 5301 Campus Drive, Fort Worth, Texas 76119.

The selected engineering firm is referred to in this RFQ as the Consultant or Design Professional. Electrical engineering shall serve as the lead design discipline. The Consultant shall provide the additional disciplines identified below through its own staff or subconsultants.

Additional information

The successful bidder will be selected on qualifications, reasonable pricing, and best value.

All contracts (with an estimated cost of $50,000.00 or more) will be awarded and administered in accordance with the following standards and procedures: [...] The vendor/contractor must submit the *Subcontractor Utilization Form* and/or *Good Faith Effort Form*, and appropriate documentation. [...] Failure to comply with the bid specifications, inclusive of M/WBE/HUB goals and documentation, will render vendor/contractor as nonresponsive.

The Prime Contractor will submit invoices monthly or as designated by the contract documents. TCCD will pay approved invoices or payment requests within thirty (30) calendar days.

Documents

6 files

Subscribe to get these 6 documents.

  • Exhibit J -TCCD HUB Program Manual -RFP 26-020 Low Voltage -FINAL.pdf
    Download
  • Exhibit K -B101 and Exhibits Combined 091221 for RFQ-26-020 Low Voltage -FINAL.pdf
    Download
  • Exhibit L -2012 Electrical Infrastructure Assessment and Power System Studies.pdf
    Download
  • Exhibit M -Historical South Campus Electrical Distribution System Upgrade.pdf
    Download
  • Exhibit N -South Campus Electrical GIS.pdf
    Download
  • RFQ 26-020 Low Voltage Upgrade Design at SO Campus -FINAL.pdf
    Download

Similar open bids

In Texas

More from Tarrant County College District

Open bids