High Valley Transit District (Utah) posted this RFQu on Nov 20, 2026. Responses are due Dec 11, 2026. Category: Architecture & Engineering. Questions are due 2026-12-04 15:00. Solicitation number HVTCP26007.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
High Valley Transit District (HVT) is soliciting Statements of Qualifications (SOQs) from qualified consulting firms to conduct a comprehensive analysis, including economic assessment, public benefit study, and location identification for transit facilities expanding HVT services in the Wasatch Back linking Heber City (Wasatch County), Coalville (Summit County), and unincorporated county area. The selected consultant will lead the comprehensive analysis, complete initial design concepts, and perform environmental review through the Planning and Environmental Linkages (PEL) process, including required coordination with Heber City, Wasatch County, Coalville, Summit County, and other stakeholders.
This procurement is a Qualifications-Based Selection (QBS), which requires architectural and engineering services to be selected solely on qualifications. [...] No pricing, fee, rate, or cost information shall be submitted or considered during the evaluation process. Final scope and fee will be negotiated only after HVT selects the highest-ranked firm.
The Consultant shall provide all professional services necessary to support HVT's delivery of the Wasatch Back Feasibility and Benefits Studies, including facility feasibility and siting studies, economic and public benefit analysis, conceptual design, and environmental review. All work shall comply with applicable federal, state, and local requirements, terms and conditions of the federal RTA grant, and standards adopted by HVT.
The work will take place over approximately 18 months from Notice to Proceed (NTP). The phases of work are outlined below:
The Consultant shall be responsible for overall project management, coordination, quality control, schedule management, stakeholder engagement, and delivery of all required project documentation.
The Consultant shall:
The selected Consultant shall actively support federal compliance reporting and grant management coordination with the USDOT BAB and other partners as necessary.
All SOQs must be submitted electronically through Bonfire, HVT's official procurement portal. **Due December 11th, 2026 at 3:00 PM MST.** Late submissions will not be accepted. Faxed, emailed, mailed, or hand-delivered SOQs will not be considered.
Questions must be submitted via Bonfire before December 4th, 2026, at 3:00 MST.
SOQs must remain valid for 90 days after the submission deadline.
SOQ format: maximum length 3 pages (excluding cover letter and appendices); minimum font size 10 pt; file format PDF only. Signed federal certifications regarding Government-Wide Debarment and Suspension and Lobbying Restrictions are **required** (*Appendix C*).
The SOQ will be evaluated according to the following criteria (100 Points Total):
No cost, fee, rate, or pricing information shall be submitted or evaluated.
Effective Date: January 21, 2027. Termination Date: July 21, 2028 unless terminated earlier or otherwise extended in accordance with the terms and conditions of this Contract. Renewal options (if any): None.
Subscribe to get this document.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.