EMC Design Silverlake Pkwy Roundabout Removal & Roadway Improvements

Active EMC-FY27-13 RFPArchitecture & EngineeringEagle Mountain City
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Eagle Mountain City (Utah) posted this RFP on Nov 23, 2026. Responses are due Dec 15, 2026. Category: Architecture & Engineering. Solicitation number EMC-FY27-13.

Solicitation details

General information

Solicitation number
EMC-FY27-13
Notice type
RFP
Place of performance
Utah

Agency and category

Agency
Eagle Mountain City
Category
007Architecture & Engineering
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

Eagle Mountain City is seeking proposals and detailed cost estimates from qualified engineering consultants to provide professional engineering services for the design of the Silver Lake Parkway Roundabout Removal and Roadway Improvements Project.

Scope

The project includes improvements along Silver Lake Parkway at Golden Eagle Road and Woodhaven Boulevard, as well as roadway improvements extending south toward the Saratoga Springs boundary. The project will remove the existing roundabouts at Silver Lake Parkway and Golden Eagle Road and at Silver Lake Parkway and Woodhaven Boulevard and replace them with conventional signalized intersections. The project will also include roadway realignment, turn-lane improvements, pedestrian and trail modifications, access management, landscaping and irrigation, right-of-way documentation, mailbox relocations, and design of approximately 350 feet of full roadway section south of Golden Eagle Road to the Saratoga Springs boundary.

The project includes three primary design elements:

1. Removal and reconstruction of the existing roundabout at Silver Lake Parkway and Golden Eagle Road as a conventional signalized intersection.
2. Removal and reconstruction of the existing roundabout at Silver Lake Parkway and Woodhaven Boulevard as a signalized T-intersection, with Silver Lake Parkway terminating at Woodhaven Boulevard and Woodhaven Boulevard continuing south.
3. Design of approximately 350 feet of full roadway section south of Golden Eagle Road to the Saratoga Springs boundary, including roadway, drainage, trail, curb and gutter, and park strip improvements.

The consultant shall provide all engineering services necessary to prepare complete construction documents and bid documents for the project.

Project Management and Coordination

  • Conduct a kickoff meeting with Eagle Mountain City staff.
  • Coordinate regularly with City staff throughout design.
  • Develop and maintain a project schedule identifying major design milestones and City review periods.
  • Coordinate with affected utilities, adjacent property owners, Saratoga Springs, emergency services, USPS, and other agencies or stakeholders as necessary. [...]

Right-of-Way Documentation

The consultant shall prepare right-of-way and property documentation necessary to support the proposed improvements. [...]

Campbell Circle Emergency Access

The consultant shall design a gated emergency-access connection at Campbell Circle.

Jimmy Lane Access Modification

The consultant shall modify access at Jimmy Lane to restrict the intersection to right-in/right-out movements only.

Mailbox Relocation

The consultant shall design and coordinate relocation of three existing cluster mailbox unit locations affected by the proposed roadway improvements.

Additional information

Interested parties may obtain a copy of this RFP and submit responses through the State of Utah's Public Procurement Portal: purchasing.utah.gov

**Insurance verification with bid**, Certificate of Insurance at contract signing. Any bid / proposal received after the scheduled closing time for receipt of bids will not be considered.

The chosen vendor will submit the remaining required insurance, bonds, and other required documentation with a signed contract.

Documents

3 files

Subscribe to get these 3 documents.

  • Concept Images for Silverlake Improvements.pdf
    Download
  • Engineering Services Contract Ex. A-updated 03.2026.pdf
    Download
  • RFP EMC Design Silverlake Roundabout Removals.pdf
    Download

Similar open bids

In Utah

More from Eagle Mountain City

Open bids