Utah Division of Facilities Construction and Management (Utah) posted this RFP on Nov 17, 2026. Responses are due Dec 10, 2026. Category: Architecture & Engineering. Questions are due 2026-11-30 15:00. Solicitation number MP27009.
This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.
Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.
The State of Utah Division of Facilities Construction and Management (DFCM) is requesting proposals for Design services for the following project:
Main Building Renovation, Bridgerland Technical College, Logan, Utah. DFCM Project #27323210 | U3P Reference # MP27009
Brief Project Description: The State of Utah (DFCM) and Bridgerland Technical College (BTECH) are seeking design services to remodel approximately 11,720 GSF of existing space in the campus Main Building into an advanced Automation Technology and Control Systems & Robotics facility. The project will consolidate and expand hands on instructional labs, a robotics lab, a specialized danger lab, faculty support spaces, and high demand MEP infrastructure to alleviate current capacity constraints. The project will modernize the space to meet rapid regional manufacturing workforce demands.
Construction Cost Estimate: **$2,337,000.00**
The State of Utah – Division of Facilities Construction and Management in partnership with Bridgerland Technical College (BTECH), is soliciting professional architectural design services for the Bridgerland Technical College Automation Technology Remodel located at the Logan Main Campus.
This project entails the renovation and adaptive reuse of approximately 11,720 gross square feet of existing interior space within the campus Main Building to establish a consolidated, advanced instructional center for Automation Technology and Control Systems & Robotics. [...] this renovation will relocate programs currently housed in the West Building to form a modernized core alongside related trades.
Key Programmed Spaces Include:
Project delivery method: Design / Bid / Build.
The design team and all subconsultants must comply with the latest adopted editions of codes, regulations, and institutional guidelines including:
Project Risk Factors:
Submission
All proposals must be submitted through the U3P website no later than the time and date specified on the Solicitation Schedule. Late proposals will not be accepted. Proposal documents listed in Sections 1 – 5 above must be combined and uploaded as one PDF document. Total Page Limit for Sections 1 - 5: 12. Font Size: 12 minimum. Hyperlinks to additional pages and external sources are not allowed and will not be assessed as part of the proposal.
The *DFCM Termination or Debarment Form* shall be uploaded independent of Sections 1 – 4 and the *DFCM Past Performance References Form*.
Mandatory Meeting
All prime Consultants wishing to propose on this project must attend and sign in. Consultants not in attendance at this meeting are ineligible to propose on this project.
Selection Criteria Points Summary
Contract
Following selection of a Consultant by the Selection Committee, and prior to the award of the Contract, DFCM will negotiate the final Contract fee with the highest scoring Consultant. Project Substantial Completion Prior To: June 30, 2028.
Subscribe to get these 7 documents.
The operating system for your proposal team - for federal and state contractors. Submit a polished proposal with minimal effort.
Plans from $129 a month, or $99 a month billed yearly.