DFCM Construction - VBS Consultant Services - Design - Bridgerland Technical College - Main Building Renovation - 27323210

Active MP27009 RFPArchitecture & EngineeringUtah Division of Facilities Construction and Management
The full text, documents and contacts of this bid come with a ProposalWorkspace plan.Get started

At a glance

Utah Division of Facilities Construction and Management (Utah) posted this RFP on Nov 17, 2026. Responses are due Dec 10, 2026. Category: Architecture & Engineering. Questions are due 2026-11-30 15:00. Solicitation number MP27009.

Solicitation details

General information

Solicitation number
MP27009
Notice type
RFP
Place of performance
Utah
Questions due
2026-11-30 15:00

Agency and category

Agency
Utah Division of Facilities Construction and Management
Category
007Architecture & Engineering
Source listing
Link with a plan

About this listing

ProposalWorkspace summary

This bid was found on the agency's procurement portal. The portal's own text is not republished here; the summary below was written by ProposalWorkspace's AI from the bid documents. The full posting is on the portal - subscribe to get the link.

Summary

AI-read from the bid documents

Summary fields on this page were extracted by AI from the bid documents. Always verify dates, amounts and requirements against the official solicitation.

What the bid is for

The State of Utah Division of Facilities Construction and Management (DFCM) is requesting proposals for Design services for the following project:

Main Building Renovation, Bridgerland Technical College, Logan, Utah. DFCM Project #27323210 | U3P Reference # MP27009

Brief Project Description: The State of Utah (DFCM) and Bridgerland Technical College (BTECH) are seeking design services to remodel approximately 11,720 GSF of existing space in the campus Main Building into an advanced Automation Technology and Control Systems & Robotics facility. The project will consolidate and expand hands on instructional labs, a robotics lab, a specialized danger lab, faculty support spaces, and high demand MEP infrastructure to alleviate current capacity constraints. The project will modernize the space to meet rapid regional manufacturing workforce demands.

Construction Cost Estimate: **$2,337,000.00**

Scope

The State of Utah – Division of Facilities Construction and Management in partnership with Bridgerland Technical College (BTECH), is soliciting professional architectural design services for the Bridgerland Technical College Automation Technology Remodel located at the Logan Main Campus.

This project entails the renovation and adaptive reuse of approximately 11,720 gross square feet of existing interior space within the campus Main Building to establish a consolidated, advanced instructional center for Automation Technology and Control Systems & Robotics. [...] this renovation will relocate programs currently housed in the West Building to form a modernized core alongside related trades.

Key Programmed Spaces Include:

  • Flexible Lab Space (~5,780 GSF): High-bay, open layout active learning environment accommodating 52 students, equipped with 46 flexible workstations, standing desks, overhead Unistrut utility distribution for compressed air drops and cord reels, and integrated AV/display systems.
  • Robotics & Control Systems Lab (~1,950 GSF): Specialized clean lab environment for 20 students featuring articulated robotic arms, PLC trainers, industrial networking, and vision inspection systems.
  • Danger Lab (~1,860 GSF): Specialized industrial equipment shop accommodating 20 students, housing hydraulic pumps, mechanical trainers, motor control benches, and laser/cutting tools; engineered with dedicated roof-mounted exhaust systems maintaining continuous negative air pressure relative to adjacent areas.
  • Academic Support, Teaching Stations & Offices (~1,480 GSF): Dedicated faculty drop-in suites, private offices, and instructional tech spaces equipped for remote broadcast capability to BTECH’s Brigham City branch campus, 3D printing stations with dedicated local exhaust, and conference zones.
  • Departmental Storage (~550 GSF): High capacity, heavy duty pallet accessible storage suite.

Project delivery method: Design / Bid / Build.

The design team and all subconsultants must comply with the latest adopted editions of codes, regulations, and institutional guidelines including:

  • DFCM Design Requirements and System Design Criteria.
  • DFCM High Performance Building Standards (HPBS)

Project Risk Factors:

  • Structural Alterations to Existing Concrete Tilt-Up Panels
  • Roof Structural Capacity & Existing Lateral Bracing Interference
  • Complex Code Compliance & Building Fire Separation
  • Integration with Aging Electrical Infrastructure
  • Acoustic Isolation between Industrial Labs and Instructional Spaces
  • Active Facility Phasing & Work Adjacent to Occupied Space

Additional information

Submission

All proposals must be submitted through the U3P website no later than the time and date specified on the Solicitation Schedule. Late proposals will not be accepted. Proposal documents listed in Sections 1 – 5 above must be combined and uploaded as one PDF document. Total Page Limit for Sections 1 - 5: 12. Font Size: 12 minimum. Hyperlinks to additional pages and external sources are not allowed and will not be assessed as part of the proposal.

The *DFCM Termination or Debarment Form* shall be uploaded independent of Sections 1 – 4 and the *DFCM Past Performance References Form*.

Mandatory Meeting

All prime Consultants wishing to propose on this project must attend and sign in. Consultants not in attendance at this meeting are ineligible to propose on this project.

Selection Criteria Points Summary

  • Statement of Qualifications 90
  • Management Plan 85
  • Past Performance References 50
  • Total Possible Points 225

Contract

Following selection of a Consultant by the Selection Committee, and prior to the award of the Contract, DFCM will negotiate the final Contract fee with the highest scoring Consultant. Project Substantial Completion Prior To: June 30, 2028.

Documents

7 files

Subscribe to get these 7 documents.

  • 1-MP27009-27323210 Solicitation.pdf
    Download
  • 2-MP27009-27323210 FINAL Programming Document.pdf
    Download
  • A-DFCM General Conditions August 2020-Clean rev 07122023.pdf
    Download
  • B-DFCM Performance References Form 2.5.25.docx
    Download
  • C-DFCM Termination Debarment Certification Form 8.9.2024.pdf
    Download
  • D-DFCM Health Insurance Statement of Compliance Form
    Download
  • Revised 7.28.25.docx
    Download

Similar open bids

In Utah

More from Utah Division of Facilities Construction and Management

Open bids